My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 COE INTRO-2014.RTF <br /> 2 INTRODUCTION TO THE SPECIAL PROVISIONS <br /> 3 <br /> 4 (August 14, 2013 APWA GSP) <br /> 5 <br /> 6 The work on this project shall be accomplished in accordance with the Standard <br /> 7 Specifications for Road, Bridge and Municipal Construction, 2014 edition, as issued by the <br /> 8 Washington State Department of Transportation (WSDOT) and the American Public Works <br /> 9 Association (APWA), Washington State Chapter (hereafter "Standard Specifications"). The <br /> 10 Standard Specifications, as modified or supplemented by the Amendments to the Standard <br /> 11 Specifications and these Special Provisions, all of which are made a part of the Contract <br /> 12 Documents, shall govern all of the Work. <br /> 13 <br /> 14 These Special Provisions are made up of both General Special Provisions (GSPs) from <br /> 15 various sources, which may have project-specific fill-ins; and project-specific Special <br /> 16 Provisions. Each Provision either supplements, modifies, or replaces the comparable <br /> 17 Standard Specification, or is a new Provision. The deletion, amendment, alteration, or <br /> 18 addition to any subsection or portion of the Standard Specifications is meant to pertain only <br /> 19 to that particular portion of the section, and in no way should it be interpreted that the <br /> 20 balance of the section does not apply. <br /> 21 <br /> ' 22 The project-specific Special Provisions are not labeled as such. The GSPs are labeled <br /> 23 under the headers of each GSP, with the effective date of the GSP and its source. For <br /> 24 example: <br /> 25 <br /> 26 (March 8, 2013 APWA GSP) <br /> 27 (April 1, 2013 WSDOT GSP) <br /> 28 <br /> 29 Also incorporated into the Contract Documents by reference are: <br /> 30 ❑ Manual on Uniform Traffic Control Devices for Streets and Highways, currently <br /> 31 adopted edition, with Washington State modifications, if any <br /> 32 H Standard Plans for Road, Bridge and Municipal Construction, WSDOT/APWA, <br /> 33 current edition <br /> 334 <br /> 5 ❑ City of Everett Design and Construction Standards and Specifications for <br /> Development <br /> 36 <br /> 111 37 Contractor shall obtain copies of these publications, at Contractor's own expense. <br /> 38 <br /> I <br /> I <br /> ' PACIFIC&BROADWAY SAFETY IMPROVEMENTS <br /> FED AID#HSIP-0005(331);DOE#3523 <br /> CITYWIDE SAFETY IMPROVEMENTS <br /> FED AID#HSIP-0005(330);DOE#3524 1 December 23,2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.