Laserfiche WebLink
I <br /> 1 required by the Contract and required by law must be furnished by the Contractor 111 <br /> 2 before establishment of this date. <br /> 3 Final Acceptance Date <br /> I <br /> 4 The date on which the Contracting Agency accepts the Work as complete. <br /> 5 <br /> 6 Supplement this Section with the following: <br /> I <br /> 7 <br /> 8 All references in the Standard Specifications, Amendments, or WSDOT General Special <br /> 9 Provisions, to the terms "State", "Department of Transportation", "Washington State <br /> I <br /> 10 Transportation Commission", "Commission", "Secretary of Transportation", "Secretary", <br /> 11 "Headquarters", and "State Treasurer" shall be revised to read "Contracting Agency". <br /> 12 I 13 All references to "State Materials Laboratory" shall be revised to read "Contracting <br /> 14 Agency designated location". <br /> 15 <br /> I <br /> 16 All references to "final contract voucher certification" shall be interpreted to mean the <br /> 17 final payment form established by the Contracting Agency. <br /> 18 <br /> 19 Additive <br /> I <br /> 20 A supplemental unit of work or group of bid items, identified separately in the Bid <br /> 21 Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition <br /> 22 to the base bid. <br /> 23 <br /> 24 Alternate <br /> 25 One of two or more units of work or groups of bid items, identified separately in the Bid <br /> 26 Proposal, from which the Contracting Agency may make a choice between different <br /> 27 methods or material of construction for performing the same work. <br /> 28 I 29 Business Day <br /> 30 A business day is any day from Monday through Friday except holidays as listed in <br /> 31 Section 1-08.5. <br /> 32I <br /> 33 Contract Bond <br /> 34 The definition in the Standard Specifications for"Contract Bond" applies to whatever <br /> 35 bond form(s) are required by the Contract Documents, which may be a combination of a I <br /> 36 Payment Bond and a Performance Bond. <br /> 37 <br /> 38 Contract Documents I 39 See definition for"Contract". <br /> 40 <br /> 41 Contract Time I 42 The period of time established by the terms and conditions of the Contract within which <br /> 43 the Work must be physically completed. <br /> 44 <br /> I <br /> 45 Notice of Award <br /> 46 The written notice from the Contracting Agency to the successful Bidder signifying the <br /> 47 Contracting Agency's acceptance of the Bid Proposal. <br /> I <br /> 48 <br /> I <br /> PACIFIC&BROADWAY SAFETY IMPROVEMENTS <br /> I <br /> FED AID#HSIP-0005(331);COE#3523 <br /> CITYWIDE SAFETY IMPROVEMENTS <br /> FED AID#HSIP-0005(330);COE#3524 4 December 23,2015 <br />