Laserfiche WebLink
I <br /> 11 <br /> 2 <br /> I 3 DIVISI0NI.GR1 <br /> 4 Division 1 <br /> 5 General Requirements <br /> I 6 <br /> 7 DESWORK.GR1 <br /> 8 DESCRIPTION OF WORK <br /> 19 <br /> 10 FDESWORKI.DOCX <br /> 11 (March 13, 1995) <br /> I 12 This Contract provides for the improvement of*** curb ramps, pedestrian signals, <br /> 13 lighting, radar speed signs, rectangular rapid flashing beacons, speed enforcement <br /> 14 lights, and pavement markings at various intersections and streets within the City of <br /> 15 Everett *** and other work, all in accordance with the attached Contract Plans, these <br /> 16 Contract Provisions, and the Standard Specifications. <br /> 17 <br /> 18 1-013.RTF <br /> 1 19 1-01.3 Definitions <br /> 20 (July 23, 2015 APWA GSP) <br /> 21 <br /> I 22 Delete the heading Completion Dates and the three paragraphs that follow it, and replace <br /> 23 them with the following: <br /> 24 <br /> I 25 Dates <br /> 26 Bid Opening Date <br /> 27 The date on which the Contracting Agency publicly opens and reads the Bids. <br /> I <br /> 28 Award Date <br /> 29 The date of the formal decision of the Contracting Agency to accept the lowest <br /> 30 responsible and responsive Bidder for the Work. <br /> ' 31 Contract Execution Date <br /> 32 The date the Contracting Agency officially binds the Agency to the Contract. <br /> 33 Notice to Proceed Date <br /> I34 The date stated in the Notice to Proceed on which the Contract time begins. <br /> 35 Substantial Completion Date <br /> I 36 The day the Engineer determines the Contracting Agency has full and unrestricted <br /> 37 use and benefit of the facilities, both from the operational and safety standpoint, any <br /> 38 remaining traffic disruptions will be rare and brief, and only minor incidental work, <br /> 39 replacement of temporary substitute facilities, plant establishment periods, or <br /> I40 correction or repair remains for the Physical Completion of the total Contract. <br /> 41 Physical Completion Date <br /> 1 42 The day all of the Work is physically completed on the project. All documentation <br /> 43 required by the Contract and required by law does not necessarily need to be <br /> 44 furnished by the Contractor by this date. <br /> I <br /> 45 Completion Date <br /> 46 The day all the Work specified in the Contract is completed and all the obligations of <br /> 47 the Contractor under the contract are fulfilled by the Contractor. All documentation <br /> I <br /> I PACIFIC&BROADWAY SAFETY IMPROVEMENTS <br /> FED AID#HSIP-0005(331); COE#3523 <br /> CITYWIDE SAFETY IMPROVEMENTS <br /> FED AID#HSIP-0005(330);COE#3524 3 December 23,2015 <br />