Laserfiche WebLink
1 Additional plans and Contract Provisions may be obtained by the Contractor from the <br /> 2 source stated in the Call for Bids, at the Contractor's own expense. <br /> 3 <br /> 4 1=02.6.GR1 <br /> 5 Preparation of Proposal <br /> 6 <br /> 7 1-02.6.1NST2.GR1 <br /> 8 The fourth paragraph of Section 1-02.6 is revised to read: <br /> 9 <br /> 10 1-02.6.0PT10.GR1 <br /> 11 (May 7, 2012) <br /> 12 The Bidder shall submit with the Bid a completed Disadvantaged Business Enterprise <br /> 13 (DBE) Utilization Certification, when required by the Special Provisions. For each and <br /> 14 every DBE firm listed on the Bidder's completed Disadvantaged Business Enterprise <br /> 15 Utilization Certification, the Bidder shall submit written confirmation from that DBE firm <br /> 16 that the DBE is in agreement with the DBE participation commitment that the Bidder <br /> 17 has made in the Bidder's completed Disadvantaged Business Enterprise Utilization <br /> 18 Certification. WSDOT Form 422 031 EF (Disadvantaged Business Enterprise Written <br /> 19 Confirmation Document) is to be used for this purpose. Bidder must submit good faith <br /> 20 effort documentation only in the event the bidder's efforts to solicit sufficient DBE <br /> 21 participation have been unsuccessful. Directions for delivery of the Disadvantaged <br /> 22 Business Enterprise Written Confirmation Documents and Disadvantaged Business <br /> 23 Enterprise Good Faith Effort documentation are included in Sections 1-02.9. <br /> 24 <br /> 25 1-02.6.OPT15.GR1 <br /> 26 (August 2, 2004) <br /> 27 The fifth and sixth paragraphs of Section 1-02.6 are deleted. <br /> 28 <br /> 29 1-02.9.GR1 <br /> 30 Delivery of Proposal <br /> 31 <br /> 32 1-02.9.INSTI.GR1 <br /> 33 Section 1-02.9 is supplemented with the following: <br /> 2A <br /> J`Y <br /> 35 1-02 9.OptionA.rtf <br /> 36 1-02.9 Delivery of Proposal <br /> 37 (August 15, 2012 APWA GSP, Option A) <br /> 38 <br /> 111 <br /> 39 Delete this section and replace it with the following: <br /> 40 <br /> 41 Each proposal shall be submitted in a sealed envelope, with the Project Name and <br /> 42 Project Number as stated in the Call for Bids clearly marked on the outside of the <br /> 43 envelope, or as otherwise required in the Bid Documents, to ensure proper handling and <br /> 44 delivery. <br /> 45 <br /> 46 If the project has FHWA funding and requires DBE Written Confirmation Documents or <br /> 47 Good Faith Effort Documentation, then to be considered responsive, the Bidder shall <br /> 48 submit with their Bid Proposal, written Confirmation Documentation from each DBE firm , <br /> 49 listed on the Bidder's completed DBE Utilization Certification, form 272-056A EF, as <br /> 50 required by Section 1-02.6. <br /> 51 I <br /> PACIFIC&BROADWAY SAFETY IMPROVEMENTS <br /> FED AID#HSIP-0005(331);COE#3523 <br /> CITYWIDE SAFETY IMPROVEMENTS <br /> FED AID#HSIP-0005(330);COE#3524 6 December 23,2015 <br />