Laserfiche WebLink
I <br /> 1 The Contracting Agency will not open or consider any Bid Proposal that is received after <br /> 2 the time specified in the Call for Bids for receipt of Bid Proposals, or received in a <br /> I 3 location other than that specified in the Call for Bids. <br /> 4 <br /> 5 COE 1-02.9 Delivery to COE.RTF <br /> I 6 1-02.9 Delivery of Proposal <br /> 7 <br /> I 8 (******) <br /> 9 Revise the first paragraph to read: <br /> 10 <br /> III <br /> 12 Each proposal shall be submitted in a sealed envelope, with the Project Name and <br /> Project Number as stated in the Advertisement for Bids clearly marked on the outside of <br /> 13 the envelope, or as otherwise stated in the Bid Documents, to ensure proper handling <br /> 115 14 and delivery. <br /> 16 Sealed Proposal shall be received at the following location prior to the specified time as <br /> 17 mention in the provision section 1-02.12: <br /> I <br /> 18 <br /> 19 City of Everett <br /> 20 City Clerk's Office <br /> I <br /> 21 1st Floor Wall Street Building <br /> 22 2930 Wetmore Ave. <br /> 23 Everett, WA 98201 <br /> I 24 <br /> 25 1-02.10.RTF <br /> 26 1-02.10 Withdrawing, Revising, or Supplementing Proposal <br /> I 27 (July 23, 2015 APWA GSP) <br /> 28 <br /> 29 Delete this section, and replace it with the following: <br /> I 30 <br /> 31 After submitting a physical Bid Proposal to the Contracting Agency, the Bidder may <br /> 32 withdraw, revise, or supplement it if: <br /> 33 <br /> I34 1. The Bidder submits a written request signed by an authorized person and <br /> 35 physically delivers it to the place designated for receipt of Bid Proposals, and <br /> 36 2. The Contracting Agency receives the request before the time set for receipt of <br /> I <br /> 37 Bid Proposals, and <br /> 38 3. The revised or supplemented Bid Proposal (if any) is received by the <br /> 39 Contracting Agency before the time set for receipt of Bid Proposals. <br /> I 40 <br /> 41 If the Bidder's request to withdraw, revise, or supplement its Bid Proposal is received <br /> 42 before the time set for receipt of Bid Proposals, the Contracting Agency will return the <br /> I <br /> 43 <br /> 44 unopened Proposal package to the Bidder. The Bidder must then submit the revised or <br /> supplemented package in its entirety. If the Bidder does not submit a revised or <br /> 45 supplemented package, then its bid shall be considered withdrawn. <br /> I 46 <br /> 47 Late revised or supplemented Bid Proposals or late withdrawal requests will be date <br /> 48 recorded by the Contracting Agency and returned unopened. Mailed, emailed, or faxed <br /> I <br /> 49 requests to withdraw, revise, or supplement a Bid Proposal are not acceptable. <br /> I PACIFIC&BROADWAY SAFETY IMPROVEMENTS <br /> FED AID#HSIP-0005(331);COE#3523 <br /> CITYWIDE SAFETY IMPROVEMENTS <br /> FED AID#HSIP-0005(330);COE#3524 7 December 23,2015 <br />