Laserfiche WebLink
i <br /> 1 3. A progress schedule (in a form the Contracting Agency requires) showing the order <br /> 2 of and time required for the various phases of the work, <br /> 3 4. A breakdown of costs assigned to any bid item, <br /> 4 5. Attendance at a conference with the Engineer or representatives of the Engineer, <br /> 5 6. Obtain, and furnish a copy of, a business license to do business in the city or county <br /> 6 where the work is located. <br /> 7 7. Any other information or action taken that is deemed necessary to ensure that the <br /> 8 bidder is the lowest responsible bidder. <br /> 9 <br /> 10 <br /> 11 COE 1-03.3.RTF <br /> 12 1-0033.. <br /> 3 Execution of Contract <br /> 13 (October 1, 2005 APWA GSP) <br /> 14 <br /> 15 Revise this section to read: <br /> 16 <br /> 17 Copies of the Contract Provisions, including the unsigned Form of Contract, will be <br /> 18 available for signature by the successful bidder on the first business day following <br /> 19 award. The number of copies to be executed by the Contractor will be determined by the <br /> 20 Contracting Agency. <br /> 21 <br /> 22 Within 20 calendar days after the award date, the successful bidder shall return <br /> 23 the signed Contracting Agency-prepared contract, an insurance certification as required <br /> 24 by Section 1-07.18, and a satisfactory bond as required by law and Section 1-03.4. <br /> 25 Before execution of the contract by the Contracting Agency, the successful bidder shall 1 <br /> 26 provide any pre-award information the Contracting Agency may require under Section 1- <br /> 27 02.15. <br /> 28 <br /> 29 Until the Contracting Agency executes a contract, no proposal shall bind the Contracting <br /> 30 Agency nor shall any work begin within the project limits or within Contracting Agency- <br /> 31 furnished sites. The Contractor shall bear all risks for any work begun outside such <br /> 32 areas and for any materials ordered before the contract is executed by the Contracting <br /> 33 Agency. <br /> 34 11135 If the bidder experiences circumstances beyond their control that prevents return of the <br /> 36 contract documents within the calendar days after the award date stated above, the <br /> 37 Contracting Agency may grant up to a maximum of 20 additional calendar days <br /> 38 for return of the documents, provided the Contracting Agency deems the circumstances <br /> 39 warrant it. <br /> 40 <br /> 41 <br /> 42 1-03.4.RTF <br /> 43 1-03.4 Contract Bond <br /> 44 (July 23, 2015 APWA GSP) <br /> 45 <br /> 46 Delete the first paragraph and replace it with the following: <br /> 47 <br /> 48 The successful bidder shall provide executed payment and performance bond(s) for the <br /> 49 full contract amount. The bond may be a combined payment and performance bond; or <br /> PACIFIC&BROADWAY SAFETY IMPROVEMENTS <br /> FED AID#HSIP-0005(331);COE#3523 <br /> CITYWIDE SAFETY IMPROVEMENTS <br /> FED AID#HSIP-0005(330);COE#3524 10 December 23,2015 <br />