My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 <br /> 2 Payments or credits for changes amounting to $25,000 or less may be made under the <br /> 3 Bid item "Minor Change". <br /> 4 <br /> 5 1-04.5 Procedure and Protest by the Contractor <br /> 6 The first sentence of the first paragraph is revised to read: <br /> 7 <br /> 8 The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) <br /> 9 writing a separate acceptance, (3) not responding within the allotted time as outlined in <br /> 10 Section 1-04.4, or (4) not protesting in the way this Section provides. <br /> 11 <br /> 12 1-05.AP1 <br /> 13 Section 1-05, Control of Work <br /> 1 14 August 4, 2014 <br /> 15 1-05.1 Authority of the Engineer <br /> 16 In this section, "Project Engineer" is revised to read "Engineer". <br /> 17 <br /> 18 The second paragraph (up until the colon) is revised to read: <br /> I 19 <br /> 20 The Engineer's decisions will be final on all questions including the following: <br /> 21 <br /> 22 The first sentence in the third paragraph is revised to read: <br /> 23 <br /> 24 The Engineer represents the Contracting Agency with full authority to enforce Contract <br /> 25 requirements. <br /> 1 26 <br /> 27 1-05.2 Authority of Assistants and Inspectors <br /> 28 The first paragraph is revised to read: <br /> 29 <br /> 30 The Engineer may appoint assistants and Inspectors to assist in determining that the <br /> 31 Work and materials meet the Contract requirements. Assistants and Inspectors have <br /> 32 the authority to reject defective material and suspend Work that is being done <br /> 33 improperly, subject to the final decisions of the Engineer. <br /> 34 <br /> 35 In the third paragraph, "Project Engineer" is revised to read "Engineer". <br /> 36 <br /> 37 1-05.3 Plans and Working Drawings <br /> 38 This section's title is revised to read: <br /> 39 <br /> 40 Working Drawings <br /> 41 <br /> 42 This section is revised to read: <br /> 43 <br /> 44 The Contract may require the Contractor to submit Working Drawings for the <br /> 45 performance of the Work. Working Drawings shall be submitted by the Contractor <br /> 46 electronically to the Engineer in PDF format; drawing details shall be prepared in <br /> 47 accordance with conventional detailing practices. If the PDF format is found to be <br /> 48 unacceptable, at the request of the Engineer, the Contractor shall provide paper copies <br /> 49 of the Working Drawings with drawings on 11 by 17 inch sheets and calculations/text on <br /> 50 8'/ by 11 inch sheets. <br /> I <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.