My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1-07.1.0PT1.GR1 1 <br /> 2 (March 25, 2009) <br /> 3 American Recovery and Reinvestment Act of 2009 (ARRA) Employment I <br /> 4 Report <br /> 5 The Contractor shall submit monthly reports of the number of employees actively <br /> 6 working on this project for the Contractor and all Subcontractors of every tier. The <br /> 7 reports shall include all employees actively working on this project at the jobsite, in the <br /> 8 project office, in the home office, or teleworking from a home or other alternative office <br /> 9 location; and all engineering personnel, inspectors, sampling and testing technicians, <br /> 10 and lab technicians actively performing work directly in support of this project (excluding <br /> 11 suppliers) during the reporting month. <br /> 12 <br /> 13 The report shall be prepared using Form FHWA-1589 and submitted monthly to the <br /> 14 Project Engineer. The initial report shall be submitted to the Project Engineer within 30- <br /> 15 days of execution. Subsequent reports shall be submitted to the Project Engineer no <br /> I <br /> 16 later than 10-days after the end of each report month. <br /> 17 <br /> 18 Failure by the Contractor to submit ARRA Employment Reports for the Contractor and <br /> 19 all Subcontractors of every tier shall be reason for withholding all progress payments <br /> 20 until reports are received. The cost of preparing and submitting ARRA Employment <br /> 21 Reports is incidental to the Contract. The Contractor shall include all related costs in the <br /> 22 unit Bid prices of the Contract. <br /> 23 <br /> 24 1-07.1:RTF <br /> 25 1-07.1 Laws to be Observed <br /> 26 (October 1, 2005 APWA GSP) <br /> 27 <br /> 28 Supplement this section with the following: <br /> 29 <br /> 30 In cases of conflict between different safety regulations, the more stringent regulation <br /> 31 shall apply. <br /> 32I <br /> 33 The Washington State Department of Labor and Industries shall be the sole and <br /> 34 paramount administrative agency responsible for the administration of the provisions of <br /> 35 the Washington Industrial Safety and Health Act of 1973 (WISHA). <br /> 36 <br /> 37 The Contractor shall maintain at the project site office, or other well known place at the <br /> 38 project site, all articles necessary for providing first aid to the injured. The Contractor <br /> 39 shall establish, publish, and make known to all employees, procedures for ensuring <br /> 40 immediate removal to a hospital, or doctor's care, persons, including employees, who <br /> 41 may have been injured on the project site. Employees should not be permitted to work <br /> I <br /> 42 on the project site before the Contractor has established and made known procedures <br /> 43 for removal of injured persons to a hospital or a doctor's care. <br /> 44 <br /> 45 The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of <br /> 46 the Contractor's plant, appliances, and methods, and for any damage or injury resulting <br /> 47 from their failure, or improper maintenance, use, or operation. The Contractor shall be <br /> 48 solely and completely responsible for the conditions of the project site, including safety <br /> 49 for all persons and property in the performance of the work. This requirement shall <br /> 50 apply continuously, and not be limited to normal working hours. The required or implied <br /> I <br /> PACIFIC&BROADWAY SAFETY IMPROVEMENTS <br /> FED AID#HSIP-0005(331); COE#3523111 <br /> CITYWIDE SAFETY IMPROVEMENTS <br /> FED AID#HSIP-0005(330);COE#3524 22 December 23,2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.