My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 I <br /> 2 1. By meeting the goal <br /> 3 The best indication of good faith efforts is to document, through <br /> 4 submission of the Disadvantaged Business Enterprise Utilization <br /> 5 Certification and supporting Disadvantaged Business Enterprise <br /> 6 (DBE) Written Confirmation Document(s) that the Bidder has obtained <br /> 7 enough DBE participation to meet or exceed the assigned DBE COA <br /> 8 contract goal. That being the case no additional GFE documentation <br /> 9 is required. Or; <br /> 10 <br /> 11 2. By documentation that it made adequate GFE to meet the goal <br /> 12 The Bidder may demonstrate a GFE in whole or part through GFE <br /> 13 documentation ONLY IN THE EVENT a Bidder's efforts to solicit <br /> 14 sufficient DBE participation have been unsuccessful. In this case, the <br /> 15 Bidder must supply GFE documentation in addition to the <br /> 16 Disadvantaged Business Enterprise Utilization Certification, and I <br /> 17 supporting Disadvantaged Business Enterprise (DBE) Written <br /> 18 Confirmation document(s). <br /> 19 <br /> 20 Note: In the case where the Bidder was awarded the contract based on <br /> 21 demonstrating adequate GFE the advertised DBE goal will not be <br /> 22 reduced to the Bidder's partial commitment. The Bidder shall <br /> 23 demonstrate a GFE during the life of the Contract to attain the DBE <br /> 24 Condition of Award (COA) Goal as assigned to the project. <br /> 25 <br /> 26 Good Faith Efforts (GFE) Documentation <br /> 27 GFE documentation shall be received, as specified in the special provisions <br /> 28 for Section 1-02.9 Delivery of Proposal. <br /> 29 <br /> 30 Based upon all the relevant documentation submitted in Bid or as supplement <br /> 31 to Bid, the Contracting Agency shall determine whether the Bidder has <br /> 32 demonstrated a sufficient GFE to achieve DBE participation. The Contracting <br /> 33 Agency will make a fair and reasonable judgment of whether a Bidder that did <br /> 34 not meet the goal through participation, made adequate good faith efforts as <br /> 35 demonstrated by the GFE documentation. <br /> 36 <br /> 37 The following is a list of types of actions, which would be considered as part of <br /> 38 the Bidder's GFE to achieve DBE participation. It is not intended to be a <br /> 39 mandatory checklist, nor is it intended to be exclusive or exhaustive. Other i <br /> 40 factors or types of efforts may be relevant in appropriate cases: <br /> 41 <br /> 42 1. Attendance by the Bidder at any pre-solicitation or pre-Bid meetings <br /> 43 that were scheduled by the Contracting Agency to inform DBEs of <br /> 44 contracting and subcontracting or material supply opportunities <br /> 45 available on the project; <br /> I <br /> 46 2. Contacting local Tribes, Tribal Employment Rights Offices (TERO) <br /> 47 concerning the subcontracting or supply opportunities in sufficient <br /> 48 time to allow the enterprises to participate effectively; I <br /> 49 3. Selection by the Bidder of specific economically feasible units of the <br /> 50 project to be performed by DBEs in order to increase the likelihood of I <br /> PACIFIC&BROADWAY SAFETY IMPROVEMENTS <br /> I <br /> FED AID#HSIP-0005(331);COE#3523 <br /> CITYWIDE SAFETY IMPROVEMENTS <br /> FED AID#HSIP-0005(330);COE#3524 40 December 23,2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.