My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> I 2 3. Freeze-thaw durability shall be provided by one of the following methods: <br /> 3 <br /> 4 a. The concrete shall maintain an air content between 4.5 and 7.5 percent. <br /> I <br /> 5 <br /> 6 b. The concrete shall maintain a minimum air content that achieves a <br /> 7 durability factor of 90 percent, minimum, after 300 cycles in accordance <br /> 8 with AASHTO T 161, Procedure A. This air content shall not be less than <br /> 9 3.0 percent. Test samples shall be obtained from concrete batches of a <br /> 10 minimum of 3.0 cubic yards. <br /> 11 <br /> I12 <br /> 13 4. Scaling shall have a visual rating less than or equal to 2 after 50 cycles in <br /> accordance with ASTM C 672. <br /> 14 <br /> I <br /> 15 5. Shrinkage at 28 days shall be less than 0.032 percent in accordance with <br /> 16 AASHTO T 160. <br /> 17 <br /> I 18 6. Modulus of elasticity shall be measured in accordance with ASTM C 469. <br /> 19 <br /> 20 7. Density shall be measured in accordance with ASTM C 138. <br /> 21 <br /> I22 The Contractor shall submit the mix design in accordance with Section 6-02.3(2)A. The <br /> 23 submittal shall include test reports for all tests listed above that follow the reporting <br /> 24 requirements of the AASHTO/ASTM procedures. Samples for testing may be obtained <br /> 1 <br /> 25 from either laboratory or concrete plant batches. If concrete plant batches are used, the <br /> 26 minimum batch size shall be 3.0 cubic yards. The Contractor shall submit the mix <br /> 27 design to the Engineer at least 30 calendar days prior to the placement of concrete in <br /> I <br /> 28 <br /> 29 the bridge deck. <br /> 30 6-02.3(2)A2 Contractor Mix Design for Self-Consolidating Concrete <br /> I 31 Self-consolidating concrete (SCC) is concrete that is able to flow under its own weight <br /> 32 and completely fill the formwork without the need for vibration while maintaining <br /> 33 homogeneity, even in the presence of dense reinforcement. SCC shall be capable of <br /> I 34 being pumped, and of flowing through the steel reinforcing bar cage without segregation <br /> 35 or buildup of differential head inside or outside of the steel reinforcing bar cage. <br /> 36 <br /> 37 Type Ill cement may be used in SCC. <br /> I <br /> 38 <br /> 39 SCC may be used for the following concrete Structure elements: <br /> 40 <br /> I <br /> 41 1. All cast-in-place concrete elements except bridge decks, bridge approach <br /> 42 slabs, and any cast-in-place concrete element excluded by the Special <br /> 43 Provisions. <br /> I 44 <br /> 45 2. Prestressed concrete girders in accordance with Sections 6-02.3(25). <br /> 46 <br /> I 47 3. All precast concrete elements identified in Section 6-02.3(27)A. <br /> 48 <br /> 49 The mix design submittal shall include items specified in Section 6-02.3(2)A and results <br /> 50 of the following tests conducted on concrete that has slump flow within the slump flow <br /> 51 range defined below: <br /> 52 <br /> I <br /> I AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.