Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> I 2 6-02.3(5)1 Vacant <br /> 3 This section, including title, is revised to read: <br /> 4 <br /> Is <br /> 6 6-02.3(5)1 Test Section for Cast-In-Place SCC <br /> Unless otherwise approved by the Engineer, the Contractor shall construct a test <br /> 7 section of the element being constructed of cast-in-place SCC. The Contractor shall <br /> I <br /> 8 confirm, through the SCC placement operation in the test section, the SCC flows the <br /> 9 distance required, completely filling the forms and encapsulating the reinforcement as <br /> 10 required without leaving voids and pockets and causing segregation of the SCC mix. <br /> 11 The test section forms, reinforcing steel and concrete placing operations shall be <br /> I 12 identical to those to be used in the production elements. <br /> 13 <br /> 14 For horizontal elements, the test section shall simulate the flow of concrete for the <br /> U <br /> 15 maximum distance anticipated during production concrete placement. The depth and <br /> 16 width of the test section for horizontal element may be smaller than the actual depth and <br /> 17 width of the element to be cast. For vertical elements, the test section shall be a <br /> I18 <br /> 19 minimum of 33-percent of the height of the tallest element to be constructed. The <br /> Contractor shall submit Type 2 Working Drawings consisting of formwork and <br /> 20 reinforcement details of the test section and SCC placement procedures. <br /> I 21 <br /> 22 After removing the forms, the test section will be inspected for signs of honeycombs, <br /> 23 cracks, aggregate segregation, sedimentation, cold joints, and other surface and <br /> 24 concrete placement defects. If such defects are present, the Contractor shall revise the <br /> I25 formwork and SCC placement procedures as necessary to eliminate such defects. <br /> 26 <br /> 27 Acceptance of the test section and the SCC mix design is contingent on acceptable <br /> I 28 visual inspection, and a minimum of two 4-inch minimum diameter core samples taken <br /> 29 from the placement location and the furthest-most limits of the concrete as identified by <br /> 30 the Engineer. The number of core locations will be specified by the Engineer. The <br /> I 31 difference in average unit weight of the locations represented by the core samples shall <br /> 32 be less than 5-percent. <br /> 33 <br /> I <br /> 34 <br /> 35 The Contractor shall use the same SCC placement procedures confirmed by the <br /> Engineer accepted test section for casting the production members. <br /> 36 <br /> I 37 6-02.3(6)A2 Cold Weather Protection <br /> 38 The first sentence in the first paragraph is revised to read: <br /> 39 <br /> I40 This Specification applies when the weather forecast on the day of concrete placement <br /> 41 predicts air temperatures below 35°F at any time during the 7 days following placement. <br /> 42 <br /> 43 The first sentence of the second paragraph is revised to read: <br /> I <br /> 44 <br /> 45 The temperature of the concrete shall be maintained above 50°F during the entire <br /> 46 curing period or 7 days, whichever is greater. <br /> I 47 <br /> 48 6-02.3(9) Vibration of Concrete <br /> 49 This section is supplemented with the following two new paragraphs: <br /> I 50 <br /> 51 Vibration of SCC shall only be used as described below or as approved by the <br /> 52 Engineer: <br /> I <br /> I AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.