Laserfiche WebLink
I <br /> 1 <br /> I 2 6-02.3(5)1 Vacant <br /> 3 This section, including title, is revised to read: <br /> 4 <br /> Is <br /> 6 6-02.3(5)1 Test Section for Cast-In-Place SCC <br /> Unless otherwise approved by the Engineer, the Contractor shall construct a test <br /> 7 section of the element being constructed of cast-in-place SCC. The Contractor shall <br /> I <br /> 8 confirm, through the SCC placement operation in the test section, the SCC flows the <br /> 9 distance required, completely filling the forms and encapsulating the reinforcement as <br /> 10 required without leaving voids and pockets and causing segregation of the SCC mix. <br /> 11 The test section forms, reinforcing steel and concrete placing operations shall be <br /> I 12 identical to those to be used in the production elements. <br /> 13 <br /> 14 For horizontal elements, the test section shall simulate the flow of concrete for the <br /> U <br /> 15 maximum distance anticipated during production concrete placement. The depth and <br /> 16 width of the test section for horizontal element may be smaller than the actual depth and <br /> 17 width of the element to be cast. For vertical elements, the test section shall be a <br /> I18 <br /> 19 minimum of 33-percent of the height of the tallest element to be constructed. The <br /> Contractor shall submit Type 2 Working Drawings consisting of formwork and <br /> 20 reinforcement details of the test section and SCC placement procedures. <br /> I 21 <br /> 22 After removing the forms, the test section will be inspected for signs of honeycombs, <br /> 23 cracks, aggregate segregation, sedimentation, cold joints, and other surface and <br /> 24 concrete placement defects. If such defects are present, the Contractor shall revise the <br /> I25 formwork and SCC placement procedures as necessary to eliminate such defects. <br /> 26 <br /> 27 Acceptance of the test section and the SCC mix design is contingent on acceptable <br /> I 28 visual inspection, and a minimum of two 4-inch minimum diameter core samples taken <br /> 29 from the placement location and the furthest-most limits of the concrete as identified by <br /> 30 the Engineer. The number of core locations will be specified by the Engineer. The <br /> I 31 difference in average unit weight of the locations represented by the core samples shall <br /> 32 be less than 5-percent. <br /> 33 <br /> I <br /> 34 <br /> 35 The Contractor shall use the same SCC placement procedures confirmed by the <br /> Engineer accepted test section for casting the production members. <br /> 36 <br /> I 37 6-02.3(6)A2 Cold Weather Protection <br /> 38 The first sentence in the first paragraph is revised to read: <br /> 39 <br /> I40 This Specification applies when the weather forecast on the day of concrete placement <br /> 41 predicts air temperatures below 35°F at any time during the 7 days following placement. <br /> 42 <br /> 43 The first sentence of the second paragraph is revised to read: <br /> I <br /> 44 <br /> 45 The temperature of the concrete shall be maintained above 50°F during the entire <br /> 46 curing period or 7 days, whichever is greater. <br /> I 47 <br /> 48 6-02.3(9) Vibration of Concrete <br /> 49 This section is supplemented with the following two new paragraphs: <br /> I 50 <br /> 51 Vibration of SCC shall only be used as described below or as approved by the <br /> 52 Engineer: <br /> I <br /> I AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />