My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br /> 1 <br /> 2 In the sixteenth paragraph, the first item in the second subparagraph is revised to read: <br /> 3 <br /> 4 The clearance to the top surface of bridge decks <br /> 5 and bridge approach slabs +1/4 in/-0". <br /> 6 <br /> 7 6-02.3(24)E Welding Reinforced Steel <br /> 8 This section is revised to read: <br /> 9 <br /> 10 Welding of steel reinforcing bars shall conform to the requirements of ANSI/AWS D1.4 <br /> 11 • Structural Welding Code - Reinforcing Steel, latest edition, except where superseded by <br /> 12 the Special Provisions, Plans, and these Specifications. <br /> 13 <br /> 14 Before any welding begins, the Contractor shall submit a Type 2 Working Drawing <br /> 15 consisting of the welding procedure for each type of welded splice to be used, including <br /> 16 the weld procedure specifications and joint details. The weld procedure specifications <br /> 17 shall be written on a form taken from AWS D1.4 Annex A, or equivalent. Test results of <br /> 18 tensile strength, macroetch, and visual examination shall be included. The form shall <br /> 19 be signed and dated. <br /> 20 <br /> 21 Welders shall be qualified in accordance with AWS D1.4. The Contractor shall be <br /> 22 responsible for the testing and qualification of welders, and shall submit Type 2 Working <br /> 23 Drawings consisting of welder qualification and retention records. The weld joint and <br /> 24 welding position a welder is qualified in shall be in accordance with AWS D1.4. The <br /> 25 welder qualifications shall remain in effect indefinitely unless, (1) the welder is not111 <br /> 26 engaged in a given process of welding for which the welder is qualified for a period <br /> 27 exceeding six months, or (2) there is some specific reason to question a welder's ability. <br /> 28 <br /> 29 Filler metals used for welding reinforcing bars shall be in accordance with AWS D1.4 <br /> 30 Table 5.1. All filler metals shall be low-hydrogen and handled in compliance with low- <br /> 31 hydrogen practices specified in the AWS code. <br /> 32 <br /> 33 Short circuiting transfer with gas metal arc welding will not be allowed. Slugging of <br /> 34 welds will not be allowed. <br /> 35 <br /> 36 For the purpose of compatibility with AWS D1.4, welded lap splices for spiral or hoop <br /> 37 reinforcing shall be considered Flare-V groove welds, indirect butt joints. <br /> 38 <br /> 39 The Contractor is responsible for using a welding sequence that will limit the alignment <br /> 40 distortion of the bars due to the effects of welding. The maximum out-of-line permitted <br /> 41 will be 1/4 inch from a 3.5-foot straight-edge centered on the weld and in line with the <br /> 42 bar. <br /> 43 <br /> 44 The ground wire from the welding machine shall be clamped to the bar being welded. <br /> 45 <br /> 46 Where epoxy-coated steel reinforcing bars are specified to be spliced by welding, the <br /> 47 epoxy coating shall be left off or removed from the surfaces to be heated, but in no <br /> 48 cases less than six inches of each bar being welded. After the welding is complete, the <br /> 49 Contractor shall apply epoxy patching material to the uncoated portions of the bar in <br /> 50 accordance with Section 6-02.3(24)H. <br /> 51 <br /> I <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.