Laserfiche WebLink
I <br /> 1 6-02.3(25)C Prestressing <br /> I 2 This section, including title, is revised to read: <br /> 3 <br /> 4 6-02.3(25)C Casting <br /> I 5 Side forms shall be steel except that cast-in-place concrete closure forms for spliced <br /> 6 prestressed concrete girders, interior forms of prestressed concrete tub girders, and end <br /> 7 bulkhead forms of prestressed concrete girders may be wood. Interior voids for <br /> 8 prestressed concrete slab girders with voids shall be formed by either wax soaked <br /> 1 9 cardboard or expanded polystyrene forms. The interior void forms shall be secured in <br /> 10 the position as shown in the Working Drawings, and shall remain in place. <br /> 11 <br /> I 12 All concrete mixes to be used shall be preapproved in the WSDOT plant certification <br /> 13 process. The temperature of the concrete when placed shall be between 50°F and <br /> 14 90°F. <br /> I 15 <br /> 16 Slump shall not exceed 4 inches for normal concrete nor 7 inches with the use of a high <br /> 17 range water-reducing admixture, nor 9 inches when both a high range water-reducing <br /> I 18 admixture is used and the water/cement ratio is less than or equal to 0.35. For self- <br /> 19 consolidating concrete (SCC), the slump requirements specified above do not apply, <br /> 20 and are instead replaced by the target slump flow and slump flow range specified as <br /> I 21 part of the SCC mix design. <br /> 22 <br /> 23 Air-entrainment is not required in the concrete placed into prestressed concrete girders, <br /> 24 including cast-in-place concrete closures for spliced prestressed concrete girders. <br /> I 25 <br /> 26 This section is supplemented with the following new sub-section: <br /> 27 <br /> I 28 6-02.3(25)C1 Acceptance Testing of Concrete for Prestressed Concrete Girders <br /> 29 Compressive strength cylinders and concrete acceptance testing shall be performed <br /> 30 once per prestressed concrete girder or once per fabrication line of prestressed <br /> I 31 concrete girders. Concrete shall not be placed until fresh concrete testing indicates <br /> 32 concrete is within acceptable limits. <br /> 33 <br /> I 34 Acceptance testing shall be performed by the Contractor and test results shall be <br /> 35 submitted to the Engineer. Unless otherwise noted below, the test methods described <br /> 36 in Section 6-02.3(5)D shall be followed. Concrete compressive strength shall be in <br /> I 37 accordance with Section 6-02.3(25)E. <br /> 38 <br /> 39 Concrete that is not self-consolidating concrete will be accepted as follows: <br /> 40 <br /> 41 1. Temperature within the allowable temperature band. <br /> 42 <br /> 43 2. Slump below the maximum allowed. <br /> I 44 <br /> 45 Concrete that is self-consolidating concrete will be accepted as follows: <br /> 46 <br /> I 47 1. Temperature within the allowable temperature band. <br /> 48 <br /> 49 2. Slump flow within the target slump flow range. <br /> 1 50 <br /> 51 3. VSI less than or equal to 1 in accordance with ASTM C 1611, Appendix X1, <br /> 52 using Filling Procedure B. <br /> 1 <br /> I AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />