My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 6-02.3(25)B Prestressing <br /> 2 Each stressing system shall have a pressure gauge or load cell that will measure <br /> 3 jacking force. The gauge shall display pressure accurately and readably with a dial at <br /> 4 least 6 inches in diameter or with a digital display. Each jack and its gauge shall be <br /> 5 calibrated as a unit and shall be accompanied by a certified calibration chart. The <br /> 6 Contractor shall submit a Type 1 Working Drawing consisting of 1 copy of this chart. ' <br /> 7 The cylinder extension during calibration shall be in approximately the position it will <br /> 8 occupy at final jacking force. <br /> 9 <br /> 10 Jacks and gauges shall be recalibrated and recertified: <br /> 11 <br /> 12 1. Annually, <br /> 13 <br /> 14 2. After any repair or adjustment, and <br /> 15 <br /> 16 3. Anytime there are indications that the jack calibration is in error. <br /> 17 <br /> 18 The Engineer may use load cells to check jacks, gauges, and calibration charts before <br /> 19 and during tensioning. <br /> 20 <br /> 21 All load cells shall be calibrated and shall have an indicator that shows prestressing <br /> 22 force in the strand. The range of this cell shall be broad enough that the lowest 10 II <br /> 23 percent of the manufacturer's rated capacity will not be used to measure jacking force. <br /> 24 <br /> 25 From manufacture to encasement in concrete, prestressing strand shall be protected <br /> 26 against dirt, oil, grease, damage, and all corrosives. Strand shall be stored in a dry, <br /> 27 covered area and shall be kept in the manufacturer's original packaging until placement <br /> 28 in the forms. If prestressing strand has been damaged or pitted, it will be rejected. <br /> 29 Prestressing strand with rust shall be spot-cleaned with a nonmetallic pad to inspect for <br /> 30 any sign of pitting or section loss. Once the prestressing steel has been installed, no <br /> 31 welds or grounds for welders shall be made on the forms or the steel in the girder, <br /> 32 except as specified. <br /> 33 <br /> 34 Post-tensioning of spliced prestressed concrete girders shall conform to Section 6- <br /> 35 02.3(26) and the following requirements: <br /> 36 <br /> 37 1. Before tensioning, the Contractor shall remove all side forms from the cast-in- <br /> 38 place concrete closures. From this point until 48 hours after grouting the I <br /> 39 tendons, the Contractor shall keep all construction and other live loads off the <br /> 40 Superstructure and shall keep the falsework supporting the superstructure in <br /> 41 place. <br /> 42 <br /> 43 2. The Contractor shall not tension the post-tensioning reinforcement until the <br /> 44 concrete in the cast-in-place closures reaches the minimum compressive <br /> 45 strength specified in the Plans. This strength shall be measured with concrete <br /> 46 cylinders made of the same concrete and cured under the same conditions as <br /> 47 the cast-in-place closures. <br /> 48 <br /> 49 3. All post-tensioning shall be completed before placing the sidewalks and <br /> 50 barriers on the Superstructure. <br /> 51 I <br /> I <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.