My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 The girders shall be braced in accordance with Sections 6-02.3(17)F4 and 6- <br /> 2 02.3(17)F5. When temporary strands in the top flange are used, they shall be cut <br /> 3 after the girders are braced and before the girder deflections are equalized and <br /> 4 intermediate diaphragms are cast. <br /> 5 <br /> 6 Instead of the oak block wedges shown in the Plans, the Contractor may use Douglas fir <br /> 7 blocks if the grain is vertical. The height of oak block wedges at the girder centerline <br /> 8 shall not exceed the width. 1119 <br /> 10 The Contractor shall fill all block-out holes with a mortar or grout acceptable to the <br /> 11 Engineer. <br /> 12111 13 For prestressed concrete slab girders, the Contractor shall set stop plates and dowel <br /> 14 bars at the top of pier walls with either epoxy grout conforming to Section 9-26.3 or type <br /> 15 IV epoxy bonding agent conforming to Section 9-26.1. <br /> 16 <br /> 17 6-02.3(25)0 Deck Bulb Tee Girder Flange Connection <br /> 18 This section, including title, is revised to read: <br /> 19 <br /> 20 Girder to Girder Connections <br /> 21 When differential camber between adjacent girders in a span exceeds the tolerance in <br /> 22 Section 6-02.3(25)1, the Contractor shall submit a method of equalizing deflections as a <br /> 23 Type 1 Working Drawing. Any temporary strands in the top flange shall be cut in <br /> 24 accordance with Section 6-02.3(25)N prior to equalizing girder deflections. <br /> 251 <br /> 26 Prestressed concrete wide flange deck, deck bulb tee and slab girders with grouted <br /> 27 shear keys shall be constructed in the following sequence: <br /> 28 <br /> 29 1. Deflections shall be equalized in accordance with the Contractor's equalization <br /> 30 plan. <br /> 31 <br /> 32 2. Intermediate diaphragms shall be placed and weld ties shall be welded. <br /> 33 Welding ground shall be attached directly to the steel plates being welded <br /> 34 when welding the weld-ties. <br /> 35 <br /> 36 3. The keyways shown in the Plans to receive grout shall be filled flush with the <br /> 37 surrounding surfaces using a grout conforming to Section 9-20.3(2). <br /> 38 <br /> 39 4. Equalization equipment shall not be removed and other construction <br /> 40 equipment shall not be placed on the structure until intermediate diaphragms <br /> 41 and keyway grout have attained a minimum compressive strength of 2,500 psi. <br /> 42 <br /> 43 Prestressed concrete wide flange deck, deck bulb tee and slab girders without grouted <br /> 44 shear keys and prestressed concrete wide flange thin deck girders shall be constructed <br /> 45 in the following sequence: <br /> 46 <br /> 47 1. Deflections shall be equalized in accordance with the Contractor's equalization <br /> 48 plan. <br /> 49 <br /> 50 2. Intermediate diaphragms shall be placed and any weld ties shall be welded. <br /> 51 Welding ground shall be attached directly to the steel plates being welded <br /> 52 when welding the weld-ties. <br /> I <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.