My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 <br /> I 2 3. Equalization equipment shall not be removed and other construction <br /> 3 equipment shall not be placed on the structure until intermediate diaphragms <br /> 4 have attained a minimum compressive strength of 2,500 psi. <br /> 5 <br /> 111 6 6-02.3(26)F Prestressing Reinforcement <br /> 7 The last sentence in the fourth paragraph is revised to read: <br /> 8 <br /> 1 9 If the prestressing reinforcement will not be stressed and grouted for more than 7 <br /> 10 calendar days after it is placed in the ducts, the Contractor shall place an approved <br /> 11 corrosion inhibitor conforming to Federal Specification MIL-I-22110C in the ducts. <br /> I 12 <br /> 13 6-02.3(27)A Use of Self-Consolidating Concrete for Precast Units <br /> 14 The first paragraph is deleted. <br /> I 15 <br /> 16 The second paragraph (up until the colon) is revised to read: <br /> 17 <br /> I18 <br /> 19 Self-consolidating concrete (SCC) may be used for the following precast concrete <br /> structure elements: <br /> 20 <br /> I 21 Item number 2 of the second paragraph is revised to read: <br /> 22 <br /> 23 2. Precast reinforced concrete three-sided structures in accordance with Section 6- <br /> 24 02.3(29). <br /> 1 25 <br /> 26 6-02.3(27)B Submittals for Self-Consolidating Concrete for Precast Units <br /> 27 This section is revised to read: <br /> I 28 <br /> 29 With the exception of items 3, 7, and 8 in Section 6-02.3(27)A, the Contractor shall <br /> 30 submit the mix design for SCC to the Engineer for annual plant approval in accordance <br /> I 31 with Section 6-02.3(28)B. The mix design submittal shall include items specified in <br /> 32 Sections 6-02.3(2)A and 6-02.3(2)C1. <br /> 33 <br /> I 34 Items 3, 7, and 8 in Section 6-02.3(27)A require the precast plant to cast one <br /> 35 representative structure acceptable to the Engineer and have the structure sawn in half <br /> 36 for examination by the Contracting Agency to determine that segregation has not <br /> I 37 occurred. The Contracting Agency's approval of the sawn structure will constitute <br /> 38 approval of the precast plant to use SCC, and a concrete mix design submittal is not <br /> 39 required. <br /> I 40 <br /> 41 6-02.3(27)C Acceptance Testing of Self-Consolidating Concrete for Precast <br /> 42 Units <br /> 43 This section's title is revised to read: <br /> I44 <br /> 45 6-02.3(27)C Acceptance Testing of Concrete for Precast Units <br /> 46 <br /> I 47 This section is revised to read: <br /> 48 <br /> 49 Acceptance testing shall be performed by the Contractor and test results shall be <br /> I 50 submitted to the Engineer. Concrete shall conform to the requirements specified in <br /> 51 Section 6-02.3(2)A. Unless otherwise noted below, the test methods described in <br /> 52 Section 6-02.3(5)D shall be followed. Concrete compressive strength shall be in <br /> I <br /> II AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.