Laserfiche WebLink
I <br /> 1 perpendicular as possible to the surface from 5 to 8 inches from the surface of the <br /> 1 2 work. <br /> 3 <br /> 4 Manual spraying shall be done in a block pattern, typically 2 feet by 2 feet square. <br /> 5 The sprayed metal shall overlap on each pass to ensure uniform coverage. The <br /> I6 specified thickness of the coating shall be applied in multiple layers. In no case are <br /> 7 fewer than two passes of thermal spraying, overlapping at right angles, acceptable. <br /> 8 <br /> I 9 At least one single layer of coating shall be applied within 4 hours of blasting and <br /> 10 the surface shall be completely coated to the specified thickness within 8 hours of <br /> 11 blasting. <br /> I 12 <br /> 13 The minimum coating thickness shall be 6 mils unless otherwise shown in the <br /> 14 Plans. <br /> I 15 <br /> 16 6-07.3(14)G Applications of Shop Coats and Field Coats <br /> 17 The surface shall be wiped clean with solvent immediately before applying the <br /> I <br /> 18 <br /> 19 wash primer. The wash primer shall have a low viscosity appropriate for absorption <br /> into the thermal spray coating, and shall be applied within 8 hours after completion <br /> 20 of thermal spraying or before oxidation occurs. The dry film thickness of the wash <br /> 21 primer shall not exceed 0.5 mils or be less than 0.3 mils. It shall be applied using <br /> I22 an appropriate spray gun except in those areas where brush or roller application is <br /> 23 necessary. The subsequent shop primer or field coats shall be applied no less than <br /> 24 one-half hour after a wash primer. <br /> I 25 <br /> 26 The shop primer coat, when specified, shall be applied in accordance with Section <br /> 27 6-07.3(11)A and the paint manufacturer's recommendations. <br /> I 28 <br /> 29 All field coats, when specified, shall be applied in accordance with Section 6- <br /> 30 07.3(11)A and the paint manufacturer's recommendations. The color of the top <br /> I 31 coat shall conform to Section 6-03.3(30) as supplemented in these Special <br /> 32 Provisions. <br /> 33 <br /> I 34 6-07.3(2) Submittals <br /> 35 The first paragraph is revised to read: <br /> 36 <br /> I37 The Contractor shall submit Type 2 Working Drawings of the painting plan. <br /> 38 <br /> 39 6-07.3(10)A Containment <br /> 40 The second paragraph is revised to read: <br /> I41 <br /> 42 The containment length shall not exceed the length of a span (defined as pier to pier). <br /> 43 The containment system shall not cause any damage to the existing structure. All <br /> I 44 clamps and other attachment devices shall be padded or designed such that they shall <br /> 45 not mark or otherwise damage the steel member to which they are attached. All clamps <br /> 46 and other attachment devices shall be fully described in the Contractor's painting plan <br /> I <br /> 47 Working Drawing submittal. Field welding of attachments to the existing structure will <br /> 48 not be allowed. The Contractor shall not drill holes into the existing structure or through <br /> 49 existing structural members except as shown in the Contractor's painting plan Working <br /> I <br /> 50 <br /> 51 Drawing submittal. All provisions for dust collection, ventilation and auxiliary lighting <br /> within the containment system shall be fully described the Contractor's painting plan <br /> 52 Working Drawing submittal. <br /> I <br /> I AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />