Laserfiche WebLink
1 <br /> 1 <br /> 2 In the second to last paragraph, "approved" is revised to read "accepted". <br /> 3 <br /> 4 6-07.3(10)E Surface Preparation — Full Paint Removal <br /> 5 This section is revised to read: <br /> 6 <br /> 7 For structures where full removal of existing paint is specified, the Contractor shall <br /> 8 remove any visible oil, grease, and road tar in accordance with SSPC-SP 1. <br /> 9111 <br /> 10 Following preparation by SSPC-SP 1, all steel surfaces to be painted shall be prepared <br /> 11 in accordance with SSPC-SP 10, near-white metal blast cleaning. Surfaces inaccessible <br /> 12 to near-white metal blast cleaning shall be prepared in accordance with SSPC-SP 11, <br /> 13 power tool cleaning to bare metal, as allowed by the Engineer. <br /> 14 <br /> 15 6-07.3(10)F Collecting, Testing and Disposal of Containment Waste <br /> 16 In the first paragraph, the last sentence before the numbered list is revised (up until the <br /> 17 colon) to read: <br /> 18 <br /> 19 The sealed waste containers shall be stored in accordance with Section 1-06.4, the <br /> 20 painting plan, and the following requirements: <br /> 21 <br /> 22 In the second paragraph, the first sentence is revised to read: <br /> 23 <br /> 24 All material collected by and removed from the containment system shall be taken to a ' <br /> 25 landside staging area, provided by the Contractor, for further processing and storage <br /> 26 prior to transporting for disposal. <br /> 27 <br /> 28 The ninth paragraph is revised to read: <br /> 29 <br /> 30 The Contractor shall submit a Type 1 Working Drawing of all TCLP results. <br /> 31 <br /> 32 The first sentence of the last paragraph is revised to read: <br /> 33 <br /> 34 The Contractor shall submit a Type 1 Working Drawing consisting of waste disposal <br /> 35 documentation within 15 working days of each disposal. <br /> 36 <br /> 37 6-07.3(10)K Coating Thickness <br /> 38 The last paragraph is revised to read: <br /> 39 <br /> 40 If the specified number of coats does not produce a combined dry film thickness of at <br /> 41 least the sum of the thicknesses required per coat, or if an individual coat does not meet <br /> 42 the minimum thickness, or if visual inspection shows incomplete coverage, the coating <br /> 43 system will be rejected, and the Contractor shall discontinue painting and surface <br /> 44 preparation operations and shall submit a Type 2 Working Drawing of the repair <br /> 45 proposal. The repair proposal shall include documentation demonstrating the cause of <br /> 46 the less than minimum thickness along with physical test results, as necessary, and <br /> 47 modifications to work methods to prevent similar results. The Contractor shall not <br /> 48 resume painting or surface preparation operations until receiving the Engineer's <br /> 49 acceptance of the completed repair. <br /> 50 <br /> 1 <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />