My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 6-12.AP6 <br /> ' 2 Section 6-12, Noise Barrier Walls <br /> 3 January 5, 2015 <br /> ' 4 6-12.3(1) Submittals <br /> 5 In the first paragraph, the second sentence is revised to read: <br /> ' 6 <br /> 7 The Contractor shall submit a Type 2 Working Drawing consisting of the noise barrier <br /> 8 wall access plan. <br /> 9 <br /> 10 The second paragraph (up until the colon) is revised to read: <br /> 11 <br /> 12 For construction of all noise barrier walls with shafts, the Contractor shall submit a Type <br /> 13 2 Working Drawing consisting of the shaft construction plan, including at a minimum the <br /> 14 following information: <br /> 15 <br /> ' 16 In the third paragraph, the first sentence is revised to read: <br /> 17 <br /> 18 For construction of precast concrete noise barrier walls, the Contractor shall submit <br /> ' 19 <br /> 20 Type 2 Working Drawings consisting of shop drawings for the precast concrete panels <br /> in accordance with Section 6-02.3(28)A. <br /> 21 <br /> ' 22 6-12.3(2) Work Access and Site Preparation <br /> 23 In the first paragraph, the first sentence is revised to read: <br /> 24 <br /> 25 The Contractor shall construct work access in accordance with the work access plan. <br /> 26 <br /> 27 6-12.3(3) Shaft Construction <br /> 28 The first paragraph is revised to read: <br /> ' 29 <br /> 30 The Contractor shall excavate and construct the shafts in accordance with the shaft <br /> 31 construction plan. <br /> ' 32 <br /> 33 In the last sentence of the third paragraph, "approved by the Engineer" is revised to read <br /> 34 "acceptable to the Engineer". <br /> 1 35 <br /> 36 The fourth paragraph is revised to read: <br /> 37 <br /> ' 38 <br /> 39 When caving conditions are encountered, the Contractor shall stop further excavation <br /> until implementing the method to prevent ground caving as specified in the shaft <br /> 40 construction plan. <br /> ' 41 <br /> 42 In the last sentence of the fifth paragraph, "approved" is revised to read "accepted". <br /> 43 <br /> 44 In the seventh paragraph, "approval" is revised to read "acceptance". <br /> ' 45 <br /> 46 In the eighth paragraph, the third sentence is revised to read: <br /> 47 <br /> ' 48 <br /> 49 The Contractor shall install the steel reinforcing bar cage as specified in the shaft <br /> construction plan. <br /> 50 <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.