My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premier Field Development, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Premier Field Development, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:24:10 AM
Creation date
5/20/2016 11:54:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Premier Field Development, Inc.
Approval Date
5/9/2016
Council Approval Date
4/4/2016
Department
Parks
Department Project Manager
Russell Dance
Subject / Project Title
Kasch Park Soccer Fields Synthetic Turf Ph 2
Tracking Number
0000051
Total Compensation
$2,860,100.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Premier Field Development 12/27/2016 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development 12/28/2016 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development 5/30/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
485
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 006325 <br /> Substitution Request Form <br /> PROJECT: Kasch Park Soccer Fields—Synthetic Turf Replacement Phase 2 <br /> REQUEST NO.: <br /> CONTRACTOR: DATE: <br /> We hereby submit for consideration, following product instead of specified item for <br /> above project: <br /> Section Specified Item <br /> Proposed Substitution <br /> Attach complete technical data, including laboratory tests, and samples, as applicable. <br /> Attach detailed comparison of the significant qualities (size, weight, durability, <br /> performance and similar characteristics, and including visual effect where applicable) for <br /> the proposed substitution in comparison with the original requirements. <br /> List complete installation changes and changes to Drawings and Specifications required <br /> by proposal. <br /> Fill in Blanks Below: <br /> A. Does substitution require change in Drawing dimensions? <br /> B. Will Undersigned pay for resulting building design changes including engineering <br /> and detailing costs? <br /> C. What effect does substitution have on other trades? <br /> D. Differences between proposed substitution and specified item? <br /> E. Manufacturer's guarantees of proposed and specified items are: <br /> Same Different (Explain on attachment) <br /> F. Name and address of three (3) similar projects on which product was used, and <br /> date of installation <br /> Kasch Park Soccer Fields-Synthetic Turf Replacement Phase 2 Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.