Laserfiche WebLink
SECTION 006325 <br /> Substitution Request Form <br /> G. Contract completion date is: Same Different (Explain on attachment). <br /> H. Cost Savings? <br /> Undersigned attests function and quality equivalent or superior to specified item and waives his <br /> rights to additional payment and time which may subsequently be necessitated, by failure of the <br /> substitution to perform adequately,and for the required work to make corrections thereof. <br /> Signature must be by a person having authority to legally bind his firm to the above terms. <br /> Failure to provide legally-binding signature will result in approval retraction. <br /> Submitted by: <br /> Signature Date <br /> Printed <br /> Firm <br /> Address <br /> Telephone <br /> For use by Architect: <br /> Accepted Accepted as Noted Not Accepted Received Too Late <br /> BY: Date: <br /> Remarks: <br /> For use by Owner: <br /> Accepted Accepted as Noted Not Accepted Received Too Late <br /> Project Manager Date <br /> Remarks: <br /> Kasch Park Soccer Fields-Synthetic Turf Replacement Phase 2 Page 2 of 3 <br />