Laserfiche WebLink
-20- <br /> If there is a substantial lapse of time from the submittal of this <br /> report to the start of work at the site, or if conditions change due to <br /> natural causes or construction activities at or adjacent to the site, we <br /> recommend that this report be reviewed to determine the applicability of <br /> our conclusions and recommendations considering the changed conditions <br /> and/or time lapse. <br /> We recommend that we be retained to review those portions of the plans <br /> and specifications which pertain to foundations and earthwork to evalu- <br /> ate if they are consistent with the intent of our recommendations. In <br /> addition, we recommend that we be retained to observe construction <br /> activities, particularly with regard to foundations and earthwork. We <br /> would also be available to make such other geotechnical field observa- <br /> tions as may be necessary. <br /> Unanticipated soil conditions are commonly encountered during construc- <br /> tion, and cannot be fully determined by field explorations. Such un- <br /> expected conditions can require that additional expense be made to <br /> attain a properly constructed project. Therefore, some contingency <br /> funds are recommended to accommodate such potential extra costs. <br /> We appreciate the opportunity to be of service. If you have any ques- <br /> tions or comments, or require additional services, please contact us. <br /> J/ir <br /> CONVERSE CONSULTANTS NWrr` s`. nM. <br /> yC <br /> y z ct <br /> W <br /> q 19491 rr, 2 1 <br /> Will ' • M. Kuck Gissti 'a� <br /> Senior Engineer 0NF0-.1110 <br /> �I E. R <br /> - wAs <br /> eean . Ryden <br /> Principal Engineer <br /> Ck. - <br /> V3��':OSTEO" <br /> �4`` <br /> %1.C <br /> AL EAG <br /> 1.Cv \01V \ <br />