Laserfiche WebLink
Section 004336 <br /> Proposed Subcontractors Form <br /> PART A HEATING, VENTILATION, AIR CONDITIONING,AND PLUMBING SUBCONTRACTORS <br /> 1. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106) and electrical work <br /> (as defined by RCW Chap. 19.28), Bidder MUST either identify itself or Subcontractors in the chart below. <br /> If Bidder believes such work is not part of the Work, Bidder shall write "NO WORK". <br /> 2. Bidder shall not list more than one Subcontractor for each category of Work identified, unless <br /> Subcontractors vary with Bid alternates, in which case the Bidder must indicate which Subcontractor will <br /> be used for which alternate. <br /> 3. Bidder's Bid shall be deemed non-responsive and void if: <br /> A. For heating, ventilation, air conditioning, plumbing and electrical work, Bidder fails: (1) to submit <br /> as part of the Bid the names of such Subcontractors; (2) to name itself to perform such Work; or <br /> (3)to write "No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same Work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, plumbing, and <br /> electrical subcontractors applies only to proposed heating, ventilation and air conditioning, plumbing, and <br /> electrical subcontractors who will contract directly with the general contractor submitting the Bid to the <br /> City. <br /> Type/Scope of Work Name and Address of Subcontractor or Bidder <br /> HEATING <br /> Subcontractor, bidder or"no work" MUST be stated <br /> VENTILATION AND AIR CONDITIONING <br /> Subcontractor, bidder or"no work" MUST be stated <br /> PLUMBING (as described in RCW Chap. 18.106) <br /> Subcontractor, bidder or"no work" MUST be stated <br /> ELECTRICAL (as described in RCW Chap. 19.28) <br /> Subcontractor, bidder or"no work" MUST be stated <br /> See Part B for further requirements. If Part B is not filled out as specified in Part B, the Bid is <br /> non-responsive. <br /> Kasch Park Soccer Fields-Synthetic Turf Replacement Phase 2 1 of 2 <br /> I <br />