My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premier Field Development, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Premier Field Development, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:24:10 AM
Creation date
5/20/2016 11:54:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Premier Field Development, Inc.
Approval Date
5/9/2016
Council Approval Date
4/4/2016
Department
Parks
Department Project Manager
Russell Dance
Subject / Project Title
Kasch Park Soccer Fields Synthetic Turf Ph 2
Tracking Number
0000051
Total Compensation
$2,860,100.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Premier Field Development 12/27/2016 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development 12/28/2016 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development 5/30/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
485
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 004336 <br /> Proposed Subcontractors Form <br /> PART A HEATING, VENTILATION, AIR CONDITIONING,AND PLUMBING SUBCONTRACTORS <br /> 1. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106) and electrical work <br /> (as defined by RCW Chap. 19.28), Bidder MUST either identify itself or Subcontractors in the chart below. <br /> If Bidder believes such work is not part of the Work, Bidder shall write "NO WORK". <br /> 2. Bidder shall not list more than one Subcontractor for each category of Work identified, unless <br /> Subcontractors vary with Bid alternates, in which case the Bidder must indicate which Subcontractor will <br /> be used for which alternate. <br /> 3. Bidder's Bid shall be deemed non-responsive and void if: <br /> A. For heating, ventilation, air conditioning, plumbing and electrical work, Bidder fails: (1) to submit <br /> as part of the Bid the names of such Subcontractors; (2) to name itself to perform such Work; or <br /> (3)to write "No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same Work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, plumbing, and <br /> electrical subcontractors applies only to proposed heating, ventilation and air conditioning, plumbing, and <br /> electrical subcontractors who will contract directly with the general contractor submitting the Bid to the <br /> City. <br /> Type/Scope of Work Name and Address of Subcontractor or Bidder <br /> HEATING <br /> Subcontractor, bidder or"no work" MUST be stated <br /> VENTILATION AND AIR CONDITIONING <br /> Subcontractor, bidder or"no work" MUST be stated <br /> PLUMBING (as described in RCW Chap. 18.106) <br /> Subcontractor, bidder or"no work" MUST be stated <br /> ELECTRICAL (as described in RCW Chap. 19.28) <br /> Subcontractor, bidder or"no work" MUST be stated <br /> See Part B for further requirements. If Part B is not filled out as specified in Part B, the Bid is <br /> non-responsive. <br /> Kasch Park Soccer Fields-Synthetic Turf Replacement Phase 2 1 of 2 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.