Laserfiche WebLink
Kasch Park Soccer Fields Addendum No. 01 <br /> Synthetic Turf Replacement Phase 2 March 1, 2016 <br /> 4. Pole located at top of steep slope, foundation calculations and design shall <br /> account for reduced lateral soil bearing capacity. <br /> 3.5 E-1.20 ADD new Flag Note #5: <br /> 4. Contractor shall protect existing synthetic turf by all means necessary during <br /> access to, excavation of and replacement of light poles within existing synthetic <br /> turf to remain. Contractor to provide proposed protection measures for <br /> approval prior to beginning construction. <br /> Part 4-APPENDIX: <br /> 4.1 See attached Geotechnical Report dated June 1988 <br /> Attachments: <br /> Revised Proposed Subcontractors Form <br /> F-0.2 <br /> F-1.1 A <br /> F-1.1 B <br /> F-1.1 C <br /> F-2.2 <br /> Geotechnical Report <br /> END OF ADDENDUM #1 <br /> 5 <br />