My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3129-09
>
Ordinances
>
Ordinance 3129-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2016 9:14:46 AM
Creation date
11/3/2016 9:14:02 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3129-09
Date
6/17/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contents of Everett Shoreline Master Program. The Everett Shoreline Master Program (SMP) <br /> contains the following: <br /> • Section 1 - Community Vision and Introduction <br /> • Section 2 - Users' Guide and Basic Program Requirements <br /> • Section 3 - General Goals, Objectives, Policies and Regulations <br /> • Section 4 - Shoreline Environment Designations and Management Policies <br /> • Section 5 - Shoreline Use Policies and Regulations <br /> • Section 6 - Shoreline Modification Activities Policies and Regulations <br /> • Section 7 - Definitions <br /> • Appendix A -Documents Incorporated by Reference, including: <br /> A.1 EMC 19.38 Nonconforming Uses, Buildings and Lots <br /> A.2 EMC 19.30 Floodplain Overlay Districts and Regulations <br /> A.3 Comprehensive Plan Goals, Objectives, and Policies for Environmentally Sensitive <br /> Areas <br /> A.4 EMC I9.33D.360-590 Environmentally Sensitive Areas and Applicable Definitions in <br /> EMC 19.04 <br /> A.5 Planning Director Interpretation No. 2-2000: Interim Procedures, Endangered Species <br /> Act (ESA) Listing for Chinook Salmon and Bull Trout <br /> A.6 Planning Director Interpretation No. 01-005 Standard Buffer Width Reduction <br /> A.7 EMC 19.37 Critical Areas (Applicable in Marshland Subarea only) <br /> • The Snohomish Estuary Wetland Integration Plan (SEWIP) including the SEWIP Salmon <br /> Overlay. <br /> • Marshland Subarea Plan <br /> Master Program Policies. The portions of the SMP that are not shoreline use regulations or <br /> administrative provisions are incorporated as the shoreline element of the Comprehensive Plan. <br /> These policies shall provide guidance in the interpretation of the use regulations in Section 33D <br /> —Shoreline Overlay District of the Everett Zoning Code. <br /> Master Program Regulations. The following Sections of the SMP shall constitute Section 33D— <br /> Shoreline Overlay District in the Everett Zoning Code: <br /> • Section 2 <br /> • Those provisions designated as"regulations"in Sections 3 though 6 <br /> • Figures 4.1 through 4.23 <br /> • Definitions in Section 7. <br /> Revisions to Section 33D of the Zoning Code shall be processed as shoreline master program <br /> amendments. <br /> In addition, the following development regulations have been incorporated by reference and <br /> included in Appendix A of the SMP: <br /> • EMC 19.30 Floodplain Overlay Districts and Regulations <br /> • Comprehensive Plan Goals, Objectives, and Policies for Environmentally Sensitive Areas <br /> • EMC I9.33.D. 360-590 Environmentally Sensitive Areas and Applicable Definitions in EMC <br /> 19.04 <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.