My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
145 ALVERSON BLVD 2018-04-25
>
Address Records
>
ALVERSON BLVD
>
145
>
145 ALVERSON BLVD 2018-04-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 9:41:19 AM
Creation date
11/7/2016 7:58:59 AM
Metadata
Fields
Template:
Address Document
Street Name
ALVERSON BLVD
Street Number
145
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exposed and unworked soils shall be stabilized with the application of effective BMPs to <br />prevent erosion throughout the life of the project. The specific BMPs for soil stabilization that <br />shall be used on this project include: <br />• BMP C120: Temporary and Permanent Seeding <br />• BMP C124: Sodding <br />• BMP C125: Topsoiling <br />• BMP C140: Dust Control <br />� BMP C150: Materials On Hand <br />3.1.6 Element #6 — Protect Slopes <br />All cut and fill slopes will be designed, constructed, and protected in a manner that minimizes <br />erosion. Moderate slopes are identified at the southern edge of the subject site. Specific BMPs <br />associated with this element include: <br />• BMP C124: Sodding <br />• BMP C235: Straw Wattles <br />� BMP 162: Scheduling <br />� BMP C150: Materials On Hand <br />3.1.7 Element #7 — Protect Drain Inlets <br />Conveyance piping and structures installed to convey storm water from the vicinity of the <br />subject site to the City of Everett Storm Sewer System will be protected. Water which leaves <br />the subject site will be filtered or treated to remove sediment before entering catch basins in <br />the parking area(s) or public right-of-way. Public roads identified adjacent to the subject site <br />will be kept clean to prevent migration of sediment to storm drains. All inlets identified near <br />the subject site will be inspected weekly, and after each storm event. Storm water filters will <br />TESC Plan and SWPPP 2 June 2015 <br />American Legion Memorial Park Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.