Laserfiche WebLink
2. Assess the effectiveness of erosion and sediment control measures used to control <br />the quality of storm water discharges. <br />• A Certified Erosion and Sediment Control Lead (CESCL) shall be onsite or on-call at all <br />times during the project. <br />• Whenever inspection and/or monitoring reveals that the BMPs identified in this TESC <br />and SWPPP are inadequate, due to the actual discharge of or potential to discharge <br />significant amount of any pollutant, appropriate BMPs or design changes shall be <br />implemented as soon as possible. <br />Maintaining an Updated Construction TESC and SWPPP <br />• This TESC Plan and SWPPP shall be retained onsite or within reasonable access to the <br />subject site at all times. <br />• The TESC Plan and SWPPP shall be modified whenever there is a change in the design, <br />construction, operation, or maintenance at the construction site that has, or could have, <br />a significant effect on the discharge of pollutants to waters of the state. <br />The TESC Plan and SWPPP shall be modified if, during inspections or investigation <br />conducted by the owner/operator, or the applicable local or state regulatory authority, <br />it is determined that the TESC Plan and SWPPP is ineffective in eliminating or <br />significantly minimizing pollutants in storm water discharges form the site. The TESC <br />and SWPPP shall be modified as necessary to include additional or modified BMPs <br />designed to correct problems identified. Revisions to the TESC Plan and SWPPP shall be <br />completed within seven days following the inspection. <br />3.2 Site Specific BMPs <br />Site specific BMPs are not implemented for this project. <br />TESC Plan and SWPPP 2 lune 2015 <br />American Legion Memorial Park Page 15 <br />