4.0 CONSTRUCTION PHASING AND BMP IMPLEMENTATION <br />The BMP implementation schedule is driven by the construction schedule. The following <br />provides a sequential list of the proposed construction schedule milestones and the <br />corresponding BMP implementation schedule. The list contains key milestones such as wet and <br />dry season construction. <br />The BMP implementation schedule below is keyed to proposed phases of the construction <br />project, and reflects differences in BMP installations and inspections that relate to dry season <br />construction. The project is located west of the Cascade Mountain Crest. As such, the dry <br />season is considered to be from May 1 through September 30, while the west season is <br />considered to be from October 1 through April 30. All work is anticipated to be conducted <br />during the dry season. <br />• Estimate of Construction Start Date: <br />• Estimate of Construction Finish Date: <br />• Mobilize Equipment to Subject Site: <br />• Mobilize and Store all ESC Products at Subject Site <br />• Install ESC Measures: <br />• Install Stabilized Construction Entrance: <br />• Vegetative Surface and Surface Soil Removal Activities <br />7/13/2015 <br />10/16/2015 <br />7/13/2015 <br />7/13/2015 <br />7/13/2015 <br />7/13/2015 <br />7/13/2015-10/2/2015 <br />� Complete Site Grading and Resurfacing: 10/16/2015 <br />• Permanent Erosion Control Measures and Demobilization: 12/31/2015 <br />TESC Plan and SWPPP <br />American Legion Memorial Park <br />2 June 2015 <br />Page 16 <br />