My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2856-05
>
Ordinances
>
Ordinance 2856-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2015 2:26:55 PM
Creation date
3/26/2015 2:26:53 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2856-05
Date
7/27/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
compliance with this section, shall be issued a floodplain development permit <br /> prior to application for building or public works permits. <br /> Normal maintenance and repair shall be exempt from obtaining a floodplain <br /> development permit. <br /> 3. Nothing in this chapter shall relieve the applicant from obtaining all required <br /> permits, licenses and approvals required for the proposed project under applicable <br /> federal, state and local provisions of law. <br /> BE AND THE SAME IS HEREBY AMENDED TO READ AS FOLLOWS: <br /> Permits Required. A shoreline permit or floodplain development permit shall be obtained before <br /> construction or development begins within any area of special flood hazard established in <br /> Section 30.020.A. The permit shall be for all structures including manufactured homes, as set <br /> forth in Section 4.020.D, and for all development including fill and other activities, also as set <br /> forth in Section 4.020.D. <br /> 1. Shoreline Permit Required. All permitted and conditional uses within the <br /> floodway and flood fringe district which also meet the requirements for a <br /> shoreline permit shall obtain said permit, using the review processes as described <br /> in EMC Title 15, Local Project Review Procedures, prior to obtaining <br /> construction permits. Compliance with floodplain requirements shall be addressed <br /> within the scope of the shoreline permit process and a Floodplain Development <br /> Permit, including a FEMA elevation certificate, must be obtained for all structures <br /> to be constructed in the floodplain. The shoreline permit shall be obtained prior to <br /> application for building permits. <br /> 2. Construction or substantial improvement of any building or structure and <br /> substantial improvement or reconstruction after damage of nonconforming <br /> buildings in the floodway and flood fringe shall be required to obtain a Floodplain <br /> Development Permit. Permitted and conditional uses shall be reviewed using <br /> review processes as described in EMC Title 15, Local Project Review Procedures, <br /> and when in compliance with this section, shall be issued a floodplain <br /> development permit prior to application for building or public works permits. <br /> Normal maintenance and repair shall be exempt from obtaining a floodplain <br /> development permit. <br /> 3. Nothing in this chapter shall relieve the applicant from obtaining all required <br /> permits, licenses and approvals required for the proposed project under applicable <br /> federal, state and local provisions of law. <br /> SECTION 14: That Section 3.AA of Ordinance No. 1847-92 (EMC 19.4.030) which reads in <br /> part as follows: <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.