Laserfiche WebLink
compliance with this section, shall be issued a floodplain development permit <br /> prior to application for building or public works permits. <br /> Normal maintenance and repair shall be exempt from obtaining a floodplain <br /> development permit. <br /> 3. Nothing in this chapter shall relieve the applicant from obtaining all required <br /> permits, licenses and approvals required for the proposed project under applicable <br /> federal, state and local provisions of law. <br /> BE AND THE SAME IS HEREBY AMENDED TO READ AS FOLLOWS: <br /> Permits Required. A shoreline permit or floodplain development permit shall be obtained before <br /> construction or development begins within any area of special flood hazard established in <br /> Section 30.020.A. The permit shall be for all structures including manufactured homes, as set <br /> forth in Section 4.020.D, and for all development including fill and other activities, also as set <br /> forth in Section 4.020.D. <br /> 1. Shoreline Permit Required. All permitted and conditional uses within the <br /> floodway and flood fringe district which also meet the requirements for a <br /> shoreline permit shall obtain said permit, using the review processes as described <br /> in EMC Title 15, Local Project Review Procedures, prior to obtaining <br /> construction permits. Compliance with floodplain requirements shall be addressed <br /> within the scope of the shoreline permit process and a Floodplain Development <br /> Permit, including a FEMA elevation certificate, must be obtained for all structures <br /> to be constructed in the floodplain. The shoreline permit shall be obtained prior to <br /> application for building permits. <br /> 2. Construction or substantial improvement of any building or structure and <br /> substantial improvement or reconstruction after damage of nonconforming <br /> buildings in the floodway and flood fringe shall be required to obtain a Floodplain <br /> Development Permit. Permitted and conditional uses shall be reviewed using <br /> review processes as described in EMC Title 15, Local Project Review Procedures, <br /> and when in compliance with this section, shall be issued a floodplain <br /> development permit prior to application for building or public works permits. <br /> Normal maintenance and repair shall be exempt from obtaining a floodplain <br /> development permit. <br /> 3. Nothing in this chapter shall relieve the applicant from obtaining all required <br /> permits, licenses and approvals required for the proposed project under applicable <br /> federal, state and local provisions of law. <br /> SECTION 14: That Section 3.AA of Ordinance No. 1847-92 (EMC 19.4.030) which reads in <br /> part as follows: <br /> 10 <br />