My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2859-05
>
Ordinances
>
Ordinance 2859-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2015 3:38:06 PM
Creation date
3/26/2015 3:37:32 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2859-05
Date
8/10/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
group of functions and dividing by the total acreage of the site. This average shall then <br /> be used to determine the acres of compensation required according to regulations 35.B. 2 <br /> or 3. <br /> 6. SEWIP Restoration Plan is a Guide for Objectives and Goals. The SEWIP restoration <br /> plan for an individual site must be used as the basis for setting the goals and objectives of <br /> any compensation proposed. <br /> 7. Guidelines for Developing Compensatory Mitigation Plans. Compensatory mitigation <br /> plans with applicable performance standards submitted under the SEWIP plan should <br /> follow the interagency"Guidelines for Developing Freshwater Wetlands Mitigation Plans <br /> and Proposals" (Department of Ecology Publication #94-29, 40 pp). <br /> 7a. Threatened, Endangered or Commercially Important Species. If areas in the development <br /> footprint have SEWIP-mapped "threatened, endangered or commercially important <br /> species," then the compensation plan shall incorporate design measures to mitigate any <br /> impacts to these species. (See 1997 SEWIP Figures 2.5 and 2.6.) SETOC will amend the <br /> Plan to incorporate any new mapped areas of threatened, endangered or commercially <br /> important species. If a COE regional permit is adopted, then the amendment process <br /> must meet the requirements of that permit. <br /> 8. Use of Restoration Acreage in Lieu of Maintenance & Contingency Bond. The <br /> restoration of additional wetland acreage may be used in lieu of a maintenance and <br /> contingency bond4. The area of this "in-kind"maintenance and contingency bond will be <br /> equal to the area required for compensation (one additional acre of restoration for every <br /> acre needed as compensation). Wetlands that are restored/enhanced for the maintenance <br /> and contingency bond may be used or sold by the applicant to compensate for other <br /> impacts when all the five-year performance standards established in the mitigation plan <br /> are met. Separate bonds for monitoring shall be required. <br /> 9. Monitoring Requirements. Each compensation site shall be monitored over a period of <br /> 10 years. The wetland compensation plan shall establish a set of applicable performance <br /> standards. Additionally, the compensation plan shall include post-project assessment of <br /> the site using the IVA model to determine if the projected increase in the IVA scores <br /> (restoration potential) for the compensation site has been achieved. When the <br /> performance standards established for year 5 are met (which may occur during any year <br /> of the monitoring period) and the increase in IVA points projected for the compensation <br /> site has occurred, then regulation 35.B. 3.b may be applied. <br /> 10. Projects With Impacts Outside of the Estuary Study Area. Projects with impacts outside <br /> of the SEWIP study area may be compensated for within the SEWIP study area, <br /> consistent with the SEWIP restoration and/or enhancement goals and objectives. <br /> 4 The maintenance bond would be used to ensure restoration goals and objectives are met and may include maintenance actions <br /> such as control of invasive species,watering of plants,and maintenance of any installed structures,such as inlet and outlet <br /> structures.The contingency bond would be used to provide for correction of design deficiencies identified through monitoring of <br /> hydrology,soils and wetland and buffer plantings and ensure attainment of the restoration goals and objectives. <br /> 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.