My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2859-05
>
Ordinances
>
Ordinance 2859-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2015 3:38:06 PM
Creation date
3/26/2015 3:37:32 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2859-05
Date
8/10/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BE AND THE SAME IS HEREBY AMENDED TO READ AS FOLLOWS: <br /> SEWIP Regulations <br /> When compensatory wetland mitigation is required for development in the estuary, the applicant <br /> must comply with the following regulations unless an alternative that provides equal or greater <br /> compensation is approved by state and federal resource agencies. <br /> A. SEWIP Salmon Overlay <br /> Exception for Maulsby Mudflats: The compensation ratios in Regulations 35.A. 3, 6, and 7, <br /> however, will not apply to the Maulsby Mudflats due to the high natural resource value of the <br /> mudflats and the higher uncertainty of successfully mitigating impacts to this site. <br /> Compensation ratios for development at that site will be determined at the time a development is <br /> proposed based upon specific mitigation proposals and input from appropriate state and federal <br /> agencies. <br /> 1. Unavoidable Impacts. Unavoidable adverse impacts to tidal habitat functions that result <br /> from loss of littoral habitat functions or area in the Snohomish River Estuary (including <br /> Port Gardner) shall be compensated by restoring or enhancing historic tidal aquatic <br /> habitat functions and littoral area in the estuary. <br /> Top priority is assigned to compensatory mitigation through tidal restoration in areas <br /> identified in the restoration plan (SO Section 6), and within the same EMU, where <br /> possible (Regulation 35.A.5). In cases where loss of function does not have an associated <br /> loss of littoral habitat area, mitigation can be provided in the form of restoration or <br /> enhancement of existing littoral habitat area, or by provision of new habitat area. <br /> 2. Mitigation Timing. Compensatory mitigation for unavoidable adverse impacts to tidal <br /> habitat functions shall be provided, either in advance of the impact or concurrently with <br /> the actions resulting in impact. (See Regulation 35.A.7 for a definition of concurrent <br /> mitigation.) No temporal lag shall occur between the time of loss of functions to the <br /> impact and the time when at least equivalent salmonid habitat functions are provided <br /> through mitigation actions. <br /> 3. Minimum Compensation Requirements. The minimum requirements for compensation <br /> shall be: <br /> • 1 acre (or fraction thereof) of restored littoral habitat for each acre (or fraction <br /> thereof) of littoral habitat lost from diking, dredging, and/or filling. Littoral habitat <br /> includes all area from -10.0 ft MLLW to at least OHW (where discernible; otherwise <br /> MHHW); area of both impact and mitigation sites is extended landward to the extent <br /> of the riparian zone as defined in SO Section 2.4. <br /> 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.