CERTIFICATE OF COMPLETION <br /> Project: Transmission Line 5 Crossing Pilchuck River <br /> Contractor: Frank Coluccio Construction Company <br /> Work Order No. UP 3251 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> /61 <br /> Public Works Direct.r ate <br /> Dave Davis <br /> Approved by: <br /> A is;1 - ' <br /> Maya City of erett Date <br /> Ray phan•.n <br /> Attes,• <br /> i lerk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> By: <br /> im I es, City Attorney <br /> Dat/ lP 116 <br />