My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Frank Coluccio Construction 10/24/2016
>
Contracts
>
Capital Contract
>
Frank Coluccio Construction 10/24/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2016 10:00:42 AM
Creation date
11/14/2016 10:00:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Frank Coluccio Construction
Approval Date
10/24/2016
Council Approval Date
10/12/2016
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Certificate of Transmission Line 5 Crossing
Public Works WO Number
UP 3251
Tracking Number
0000311
Total Compensation
$3,920,118.59
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATE OF COMPLETION <br /> Project: Transmission Line 5 Crossing Pilchuck River <br /> Contractor: Frank Coluccio Construction Company <br /> Work Order No. UP 3251 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> /61 <br /> Public Works Direct.r ate <br /> Dave Davis <br /> Approved by: <br /> A is;1 - ' <br /> Maya City of erett Date <br /> Ray phan•.n <br /> Attes,• <br /> i lerk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> By: <br /> im I es, City Attorney <br /> Dat/ lP 116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.