Laserfiche WebLink
Run Date: 12/8/2015 City of Everett-Public Works Department Cutoff Date: 11/20/2015 <br /> Time: 12:30 PM Contract Estimate Voucher <br /> Project:317 For Work Order#3251B Contractor: FRANK COLUCCIO CONSTRUCTION <br /> TRANSMISSION LINE#5-PILCHUCK Estimate#13 9600 M.L. KING JR.WAY SOUTH <br /> RIVER CROSSING <br /> WO 3251B BID:$3,609,685.62 SEATTLE,WA 98118 <br /> TOTAL BID:$3,609,685.62 <br /> FINAL <br /> Total Amt Previous Amt Present Amt <br /> Contract Totals to Date $3,609,685.62 $3,371,545.32 $238,140.30 <br /> Retained Amounts $0.00 $0.00 $0.00 <br /> State Tax Amounts $310,432.97 $289,952.90 $20,480.07 <br /> Amounts Paid $3,920,118.5/ $3,661,498.22 <br /> Amount to be Paid This Estimate $258,620.37 y, <br /> Checked By 1/ Date 12757 <br /> J1 <br /> • , — <br /> Recommended By I Date /2-h7 �1 <br /> Public Works Director Date (2 <br /> RECORD DDf AW Nr. CHECKOFF <br /> sector: Date: Retainage not withheld <br /> per Retainage Bond <br /> ntrn or, _ .......__...__.-._.. Dale: <br /> Work Order Number: 3251B " f/�72 302 <br /> /`/ 7 <br />