10. Geotechnical coordination: LOE includes time for providing input to the Geotechnical SOW, <br /> reviewing the Geotechnical Report, and coordinating with the Geotechnical Engineer. <br /> 11. Soil Conditions/Foundations/Geologic Hazards- LOE assumes competent soil without <br /> geologic hazards. No deep foundations required. (see assumption #7). <br /> 12. Kick-off meeting in Everett is optional. <br /> 13. All work not identified above is specifically excluded from the Structural SOW and LOE <br /> estimate. <br /> 14. Estimate does not include engineering effort for other disciplines' (Mech., Elec. l&C, etc.)for <br /> supports and details requirements. <br /> The table below provides MWH's drawing count for the Project. <br /> Structural General Notes (Special Inspections and 2 <br /> Observations) <br /> Structural Standard Details 2 <br /> • <br /> New Vault Plans, Sections and Details 2 <br /> 3. QA/QC REVIEW OF PLANS AND SPECIFICATIONS <br /> 3.1 MWH will provide general overall QA/QC review for the project, as requested. A total of 40 <br /> hrs is budgeted. The scope is limited to the budget available. <br /> 3.2 MWH will provide general QA/QC review for the overall project as requested, but does not <br /> take on responsibility for the design, other than the structural design work. <br /> 4. ENGINEERING SERVICES DURING BIDDING AND CONSTRUCTION <br /> General Assumptions for Engineering Services During Construction (ESDC): <br /> 4.1 MWH will provide limited assistance during Bidding, to assist the City with responses to <br /> bidder questions or preparation of addenda if requested. A total of 6 hrs is budgeted for the <br /> structural engineer. The scope is limited to the budget available. <br /> 4.2 MWH will provide limited assistance during Construction, to assist the City with review of <br /> structural submittals, responses to RFIs, site visits, etc., if requested. A total of 20 hrs is <br /> budgeted for the structural engineer. The scope is limited to the budget available. <br /> 4.3 MWH will provide continued limited project management services during construction phase <br /> (as described in Task 1)for an assumed 4 month period. <br /> 3 <br />