Laserfiche WebLink
Washington State Department of Transportation Page 3 Six-year Transportation Improvement Program <br /> Agency Everett From 2009 to 2014 <br /> County No. 31 Hearing Date: <br /> City No. 420 Adoption Date: <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding 1 Local Agency <br /> C. Project Title R/W <br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2009) (2010) (2011) 6th Type (MM/YY) <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 14 6 2 phases in project 12 S 00 C - PE 1/1/2010 STP(S) 135 135 135 CE <br /> Principal P CN 3/1/2011 STP(S) 765 765 765 <br /> Arterial Arterial Safety Projects T <br /> Various locations 0 <br /> Forest Park entrances on Mukilteo Boulevard,1-5&Pacific,etc. <br /> Various safety,signal related improvements Totals 900 900 0 135 765 0 <br /> 14 7 3 phases in project 8 P 0.25 C PE 1/1/2011 UAP 250 250 500 500 <br /> Principal P RW 6/1/2012 UAP 500 500 1,000 1,000 <br /> Arterial Pacific Avenue/BNSF Grade Crossing Improvements T CN 6/1/2013 UAP 2,250 2,250 4,500 4,500 <br /> Pacific Avenue and Chestnut Street 0 <br /> N/A to N/A <br /> Grade separation over BNSF rail line _ Totals 3,000 3,000 6,000 0 0 500 5,500 <br /> 14 8 2 phases in project 4 P 0.3 C PE 1/1/2011 75 75 75 <br /> Principal P CN 7/1/2012 UAP 225 200 425 425 <br /> Arterial Evergreen Way Widening T <br /> Evergreen Way 0 <br /> 11500 block to Airport Road <br /> • <br /> Design,construct street widening/improvements Totals 225. 275 500 0 0 75 425 <br /> 14 9 1 phase in project 31 P 0 C PE 1/1/2011 200 200 200 <br /> Principal P <br /> Arterial Interstate 5 to Port of Everett Truck Route Plan T <br /> Various Arterials within City's Central Business Dist. 0 <br /> N/A to N/A <br /> Study alternative truck routes between Port and I-5 Totals 200 200 0 0 200 0 <br /> 14 10 2 phases in project 05,06,12 P 0 C PE 2/1/2012 UAP 150 150 300 300 <br /> Principal P CN 4/1/2013 UAP 1500 1500 3000 3000 <br /> Arterial Mukilteo Blvd.Saftey&Capacity Improvements T <br /> Mukilteo Blvd. 0 <br /> Friday Avenue to western city limits <br /> Corridor improvements to enhance safety and capacity Totals 1650 1650 3,300 0 0 0 3,300 <br /> 14 11 1 phase in project 31 P 0 C PE 2/1/2010 200 200 200 <br /> Principal P <br /> Arterial Arterial Needs Studies T <br /> Various Arterials within City Limits 0 <br /> N/A to N/A <br /> Study improvement needs-various classes of arterials1 _ Totals. 200 200 0 200 0 0 <br /> 14 12 2 phases in project 31 P 0 C PE 2/1/2010 50 50 50 <br /> Principal P CN 4/1/2011 350 350 350 <br /> Arterial Principal Arterial Expansion&Streetscaping T <br /> Various Arterials within City Limits 0 <br /> N/A to N/A <br /> Arterial expansion and streetscapinq improvements Totals 400 400 0 50 350 0 <br /> 16 1 3 phases in project 4 S 1 C PE 4/1/2007 STP(U) 103 AIP 155 258 <br /> Minor P RW 4/1/2009 STP(U) 1100 AIP 1,650 2,750 2,750 MCE YES <br /> Arterial 112th Street SE Improvements T CN 7!12010 STP(U) 760 AIP 1,138 1,898 1,898 3/1/2009 <br /> 112th Street SE 0 <br /> Silver Lake Road to SR 527 W <br /> Design,construct five-lane street,bike,and ped improv. 1,963 2,943 0 4,906 2,750 1,898 0 0 <br />