|
Washington State Department of Transportation Page 2 Six-year Transportation Improvement Program
<br /> Agency Everett From 2009 to 2014
<br /> County No. 31 Hearing Date:
<br /> City No. 420
<br /> MPO PSRC Adoption Date:
<br /> Resolutitionn No.
<br /> Project Identification Project Costs in Thousands of Dollars Federally Funded
<br /> A.Federal Ad No. Fund Source Information Expenditure Schedule Projects Only
<br /> B.Bridge No. Federal Funding Local Agency
<br /> C.Project Title
<br /> RNy
<br /> D.Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required
<br /> Functional Priority E.Beginning MP or road-Ending MP or road men( Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date
<br /> Class Number F.Describe Work to be Done Type Status Length Codes Phase (mm/dd/w) Code Phase Code Funds Funds Funds (2008) (2009) (2010) 6th Type (MM/YY)
<br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
<br /> 141 3 phases in project 3 P 2.5 C PE 6/12013 WSDOT 3,000 3,000 3,000
<br /> Freeways 5/640 P RW 6/1/2015 WSDOT
<br /> US 2 Improvements T CN 6/12016 WSDOT
<br /> US 2 Improvements 0
<br /> 1-5 and SR 204
<br /> Add lane each direction,improve interchanges Totals 3,000 3,000 0 0 0 3,000
<br /> 122 3 phases in project 3 P- 0.3 C PE 1/1/2013 WSDOT 4,000 4,000 2,000
<br /> Freeways P RW 6/1/2015 WSDOT 11,000 11,000
<br /> SR 526/Hardeson Road Interchange T CN 6/12017 WSDOT 23,000 23,000
<br /> SR 526 0
<br /> SR 526 at Hardeson Road
<br /> Add on and off-ramps Totals 38,000 0 38,000 0 0 0 2,000
<br /> 12 3 3 phases o project 1 P 0.3 PE 6/12011 WSDOT 8,500 8,500 1,500 7,000
<br /> Freeways
<br /> SR 526 Extension Study
<br /> SR 526
<br /> Interstate 5 to US 2 across the Snohomish Valley
<br /> Study possible extension of SR 526 across Sno.Valley Totals 8,500 0 8,500 0 0 1,500 7,000
<br /> 12 4 3 phases in project 1 P 0.3 C PE 6/12013 WSDOT 4,000 4,000 4,000
<br /> Freeways P RW 6/12015 WSDOT 11,000 11,000
<br /> SR 526/Evergreen Way Interchange T CN 6/12017 WSDOT 23,000 23,000
<br /> SR 526 0
<br /> SR 526 at Evergreen Way
<br /> Interchange improvements Totals 38,000 0 38,000 0 0 0 4,000
<br /> 12 5 3 phases in project 1 P 0.3 C PE 6/12013 WSDOT 4,000 4,000 500
<br /> Freeways P RW 6/12015 WSDOT 11,000 11,000
<br /> SR 526/40th Avenue West Intersection T CN 6/1/2016 WSDOT 23,000 23,000
<br /> SR 526 0
<br /> SR 526 at 40th Avenue West
<br /> Intersection improvements _ Totals 38,000 0 38,000 0 0 0 500
<br /> 12 6 3 phases in project 1 P 0.3 C PE 6/1/2013 250 250 250
<br /> Freeways P RW 6/1/2015 250 250
<br /> SR 529/Smith Island Ramps 7 CN 6/12017 2,000 2,000
<br /> SR 526 0
<br /> SR 526 at Evergreen Way
<br /> Interchange improvements Totals 0 2,500 2,500 0 0 0 250
<br /> 14 1 HP-1998(021) 4 phases in project 4 5 1.5 C PE ' 3/12003 DEMO 500 468 968
<br /> Principal P PE FAST 600 600
<br /> Arterial East Marine View Drive Improvements T RW 7/1/2005 DEMO 592 592 MCE 2/12007
<br /> East Marine View Drive 0 CN 8/12007 DEMO 3,808 FMSIB 600 859 5,267 2,000
<br /> North Broadway to Interstate 5 DEMO 3,500 3,500
<br /> Design,construct roadway widening and improvements _ Totals 9,000 600 1,327 10,927 2,000 0 0 0
<br /> 14 2 2 phases in project 3 S 0.2 C PE 10/12004 AIP 45 22 67
<br /> Principal P CN 71/2008 AIP 455 228 683 250
<br /> Arterial Broadway/Beverly Blvd.Intersection Improvements T
<br /> So.Broadway,Beverly Boulevard 0
<br /> Broadway at Beveny to SR 526
<br /> Design and construct intersection improvements Totals_ 500 250 750 250 0 0 0
<br /> 14 3 3 phases in project 31 P 0 C PE 9/1/2010 390 390 200 190 0
<br /> Principal P RW 9/1/2011 2,330 2,330 1,000 1,330
<br /> Arterial W.Marine View Dr/Rucker Avenue/41st Street Freight Route T CN 6/1/2013 FMSIB 1,560 1,560 1,560
<br /> W.Marine View Dr.,Rucker Avenue,41st Street O
<br /> W MVD at Rucker to Rucker at 41s1 Street
<br /> Intersection improvements for freight route from I5 to Port Totals1,560 2,720 4,280 0 200 1,190 2,890
<br /> 14 4 3 phases in Project 31 P 0 C PE 2/12010 - UCP 2,405 2,405 4,810 500
<br /> Principal P RW 2/12011 UCP 675 675 1,350 500
<br /> Arterial Broadway Corridor Improvements T CN 6/12013 UCP 13,925 13,925 27,850 3,000
<br /> South Broadway Corridor o
<br /> SR 526 to 37st Street;including bridge south of 41st Street
<br /> Widen to 5 lanes with bike lanes&sidewalks;new bridge Totals 17,005 17,005 34,010 0 S00 500 3,000
<br /> 14 5 2 phases in project 21 P 6.5 C PE 5/1/2008 CMAQ 116 116 232 150
<br /> Principal P CN 1/1/2009 CMAQ 1044 1044 2088 2000
<br /> Arterial SR 99/Evergreen Way Bus Rapid Transit Improvements T
<br /> SR 99/Evergreen Way o
<br /> 128th Street to Pacific Avenue
<br /> Conidor improvements to accommodate BRT service Totals 1,160 0 1160 2,320 2,150 0 0 0
<br />
|