My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6040
>
Resolutions
>
Resolution 6040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2016 11:57:43 AM
Creation date
11/17/2016 11:57:14 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
6040
Date
7/9/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Department of Transportation Page 5 Six-year Transportation Improvement Program <br /> Agency Everett From 2009 to 2014 <br /> County No. 31 Hearing Date: <br /> Coy No. 420 Adoption Date: <br /> MPO PSRC _ Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A.Federal Aid No. Fund Source Information E <br /> B.Bridge No. Federal Funding >Local Ages dine Projects Only <br /> C.Project Tide <br /> R/W <br /> D.Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E.Beginning MP or road-Ending MP or road mem Total Utility Project Start Fund Cost by Fut State Local Total 1st 2nd 3rd thn Enok. Date <br /> Class Number F.Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2009) (2010) (2011) 6th Type (MM/YY) <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 17 1 2 phases in project 0 <br /> Collector 8 P/S 0.2 C PE 1/1/2012 2,000 2000 2,000 <br /> Arterial East Everett Ave.BNSF O'crossing-Railway Ave. P RW 9/12013 500 500 500 <br /> Everett Evenue T CN 6/12014 FMSIB 2,500 2500 2,500 <br /> East Grad Avenue to Railway Avenue O 11,000 11000 2,000 <br /> Design and construct arterial overcrossirp Totals 2,500 13,500 16,000 0 0 0 7,000 <br /> 17 2 2 phases in project 32 ' P/S 0.3 C PE 3/1/2007 STP(E) 65 50 115 <br /> Collector P <br /> Arterial Holy Drive Non-Motorized Improvements T CN 10/302008 CMAO 409 129 538 300 CE <br /> Holy Drive O <br /> 4th Avenue West to 92nd Street <br /> Design and construct pedestrian/bike improvements Totals 474 0 179 653 300, 0 0 0 <br /> 17 3 3 phases in project 32 S 0.1 P PE 6/1/2003 STPXP 10 10 20 <br /> Collector T RW 6/12004 STPXP 10 10 <br /> Arterial Bond Street Bike and Pedestrian Improvements 0 CN 7/12008 STPXP 230 230 100 CE 8/1/2005 <br /> Bond Street <br /> Kromer Avenue to Terminal Avenue <br /> Design and construct pedestrian/bike improvements Totals 250 10 260 100 <br /> 17 4 2 phases in project 5 P 0.5 C PE 1/12010 - 350 350 350 <br /> Collector P CN 6/1/2011 3,000 3,000 2,000 1,000 <br /> Arterial Chestnut Street/Eclipse Mill Road Improvements T <br /> Chestnut Street and Eclipse Mill Road O <br /> Pacific Avenue to 36th Street <br /> Design,construct road widening,intersection improvements Totals _ 0 3,350_ 3,350 0 350 2,000 1,000 <br /> 17 5 3 phases b project 32 P 0.5 C PE 6/12010 UAP 45 30 75 75 <br /> Collector P RW 6/12011 UAP 75 50 125 125 <br /> Arterial Silver Lake Rd.-121st St.SE Ped Improv. T CN 7/1/2012 UAP 180 120 300 300 <br /> Silver Lake Road-121st Street SE W 3350 1000 <br /> 112th Street to 19th Ave.SE(SR 527) O <br /> Design and construct pedestrian improv. Totals 300 200 500 0 75 125 1300 <br /> 17 6 3 phases in project 32 P 0.8 - C PE 1/1/2010 UAP 50- 50 100 100 <br /> Collector P RW 5/12011 UAP 100 100 200 200 <br /> Arterial 36th Street/Smith St.Ped.Bice,Landscape Improv. T CN 5/1/2012 UAP 350 350 700 700 <br /> 36th Street and Smith Street O <br /> Broadway to Smith Avenue;36th to 33rd Street <br /> Design,build bike,ped&landscape improv. Totals 500 500 1000 0_ 100 200 700 <br /> 17 7 3 phases in project 6 P 1 C PE 1/1/2010 STPXP 20 20 20 <br /> Collector P RW 9/1/2010 STPXP 10 10 10 CE Yes <br /> Arterial 36th Street/BNSF At-grade Railcrossirg Closure T CN 6/30/2011 STPXP 170 170 170 <br /> 36rth Street p <br /> 6/1/2007 <br /> 36rth Street at the BNSF Rail Line <br /> Design and construct improvements to close crossing Totals 200 200_ 0 30 170 0 <br /> 17 0 3 phases in project 32 P 0.2 C PE 1/1/2008 STP(E) 100 - 50 150 50 <br /> Collector P RW 11/1/2008 CMAO 86 64 150 150 CE Yes <br /> Arterial 36th Street(or viciniyyBNSF Rail Lire Bike/Ped Crossing T CN 6/1/2010 CMAO 432 2068 2500 2,500 <br /> 36th Street or vicinity O 6/1/2008 <br /> 36th,38th or 39th Street at the BNSF Rail Line <br /> Design and construct overcrossirg _ Totals 616 _ 2,600 200 2,500 0 0 <br /> 17 9 2 phases in project 5 P 0.1 C PE 6/1/2010 UAP 30 20 50 50 <br /> Collector P CN 6/1/2011 UAP 250 200 450 450 <br /> Arterial 37th Street Improvements T <br /> 37th Street Improvements o <br /> Rucker Avenue to Wetmore Avenue <br /> Design,construct road widening,intersec.inpr. Totals_ _ 260 220 500 0 50 450 0 <br /> 17 10 3 phases in project 32 P 0 P PE 1/1/2010 150 150 150 <br /> Collector T RW 1/1/2011 200 200 200 <br /> Arterial Smith Lsland bike/ped inprovemems CN 5/1/2012 650 650 650 <br /> various arterials on Smith Island <br /> various <br /> Arterial street improvements _ Totals 1000_ 1000 0 150 200 650 <br /> 17 11 2 phases in project 31 P 0 C PE 1/1/2011 50 50 50 <br /> Collector P CN 5/1/2012 350 350 350 <br /> Arterial Mirror Arterial Expansion&Streetscapirg T <br /> Various Arterials within City Limits 0 <br /> N/A to N/A <br /> Arterial expansion and streetscapirg Improvements Totals 400 400 0 0 50 350 <br />
The URL can be used to link to this page
Your browser does not support the video tag.