Laserfiche WebLink
Washington State Department of Transportation Page 6 Six-year Transportation Improvement Program <br /> Agency Everett From 2009 to 2014 <br /> County No. 31 Hearing Date: <br /> City No. 420 Adoption Date: <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title RAW <br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2009) (2010) (2011) 6th Type (MM/YY) <br /> 1 2 3 4 56 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 - <br /> 19 1 2 phases in project 12 S 0 0 ' PE 1/1/2009 75 75 CE <br /> Local BNSF to do some of the work CN 6/1/2009 STP(S) 475 475 175 300 No <br /> Railroad Railroad crossing safety improvements <br /> Safety various locations <br /> various railroad crossings In Everett <br /> Design and construct railroad crossing improvements Totals _ 550 550 225 325 <br /> 19 2 1 phase in project 12 P 00 C CN 7/1/2009 120 120 20 20 20 60 I <br /> Local P <br /> Safety Local Roadway Safety Projects T <br /> Various locations within City limits 0 <br /> Various streets to Various streets <br /> Remove and/or modify roadside hazards Totals 120 120 20 20 20 60 <br /> 19 3 1 phase in project 12 P 00 C PE 1/1/2009 PSMF 60 60 <br /> Local P CN 4/1/2010 PSMF 540 540 <br /> Safety Safe Routes to Schools T <br /> Various locations within City limits 0 <br /> Various streets to Various streets <br /> Minor enhancements to walking/biking routes to schools Totals 600 60 540 <br /> 19 1 2 phases in project 7 S 0 0 PE 1/1/2009 <br /> Local CN 7/1/2009 6,000 6,000 1,000 1,000 1,000 3,000 <br /> Preserv./ Annual Street Overlay Program <br /> Mainten. Various streets <br /> Various streets ' <br /> Resurfacing streets Totals 6,000 6,000 1,000 1,000 1,000 3,000 <br /> 19 2 2 phases in project 6 S 00 0 PE 1/1/2009 <br /> Local CN 5/1/2009 360 360 60 60 60 180 <br /> Preserv./ Sidewalk repair and replacement <br /> Mainten. Various locations <br /> Various streets to Various streets <br /> Design,construct new and rehab.existing sidewalks Totals 360 360 60 60 60 180 <br /> 19 3 2 phases in project 12 S 00 0 PE 1/1/2009 <br /> Local CN 5/1/2009 210 210 35 35 35 105 <br /> Preserv./ Pavement Marking Project <br /> Mainten. Various locations <br /> Various streets to Various streets <br /> . Install pavement markings in various locations Totals _ 210 210 35 35 35 105 <br /> 19 1 2 phases in project 01 P 0.1 C PE 11/1/2010 85 85 85 <br /> Local G CN 6/1/2011 565 565 565 <br /> Street 106th Place SE Improvements P <br /> Constr. 106th Place SE T <br /> 16th Avenue SE to 19th Avenue SE(SR 527) W <br /> Design and construct street&signal improvements Totals 650 6500 85 565 0 <br /> 19 2 2 phases in project 01 P 0.4 C PE 1/1/2011 UAP 60 15 75 75 <br /> Local P CN 4/1/2012 UAP 500 100 600 600 <br /> Street 3rd Avenue SE Street Improvements T <br /> Constr. 3rd Avenue SE 0 <br /> 92nd Street SE to 95th Street SE <br /> Design and construct street improvements _ Totals 560 115 675 0 0 75 600 <br /> 19 3 2 phases in project os P 0.28 C PE 7/1/2011 80 80 80 <br /> Local P CN 5/1/2012 500 500 500 <br /> Street Local Street Improvements T <br /> Constr. Various locations 0 <br /> Pine,Fulton,California,etc. <br /> Design and construct street improvements Totals 580 580 0 0 80 500 <br />