My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6040
>
Resolutions
>
Resolution 6040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2016 11:57:43 AM
Creation date
11/17/2016 11:57:14 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
6040
Date
7/9/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Department of Transportation Page 8 Six-year Transportation Improvement Program <br /> Agency Everett From 2009 to 2014 <br /> County No. 31 Hearing Date: <br /> City No. 420 Adoption Date: <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title R/W <br /> Func- D. Street/County Road Name or Number Improve Phase Federal Federal State 4th Required <br /> tional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy)., Code_ Phase Code Funds Funds Funds (2009) (2010) (2011) 6th Type (MM/YY) <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 19 1 STPE-0420(002) 1 phase in project 32 S 2 P CN 5/1/2009 STP(E) 44 11 55 55 CE <br /> Local 0 No <br /> Non- Riverfront Walkway Phase II <br /> Motorized Riverfront Walkway <br /> Smith Street to 41st Street Overcrossing <br /> Construct bicycle&ped improvements Totals 44 11 55 55 0 0 0 <br /> 19 2 3 phases in project 32 P 0.3 C PE 1/1/2010 100 100 100 <br /> Local P <br /> Non- East Grand Walkway Connection T CN 7/1/2011 750 750 750 <br /> Motorized East Grand Avenue 0 <br /> 1-5 Off-ramp to Summit Avenue <br /> Design and construct bike&ped walkway Totals 850 850 0 100 750 0 <br /> 19 3 2 phases in project 32 S 1.25 C PE 7/1/2007 PSMF 63 63 <br /> Local P CN 8/1/2008 PSMF 353 353 100 <br /> Non- 7th Avenue SE Ped/Bike Improvements T <br /> Motorized 7th Avenue SE 0 <br /> 92nd Street to 112th Street <br /> Design and construct bike&ped improvements _ Totals 0 0 416 100 0 0 0 <br /> 19 4 3 phases in project 31 S/P 0.45 C PE 1/1/2007 DISCR. 350 100 450 CE <br /> Local P RW 5/1/2010 DISCR. 50 40 90 90 Yes <br /> Non- Henry M.Jackson Park Pedestrian Bridge T CN 7/1/2011 DISCR. 1600 560 2160 1160 1,000 <br /> Motorized East Marine View Drive 0 <br /> East Marine View Drive to Snohomish River <br /> Design,cosntruct bike-ped bridge to POE bike path Totals_ 2000_ 700 2,700 0 90_ 1160 1000 <br /> 19 5 2 phases in project 32 S 1.5 P PE 4/1/2009 140 140 140 <br /> Local 0 CN 4/1/2010 560 560 560 <br /> Non- Riverside Bus.Pk. Bike/Pedestrian Imprvmt. <br /> Motorized Riverside Bus.Park Trail <br /> East Marine View Drive to Jackson Ped Bridge <br /> Design and construct bicycle-ped.improvements Totals 700 700 140 560 0 0 <br /> 19 6 2 phases in project 32 P/S 3.4 C PE 8/1/2007 STP(E) 75 15 90 <br /> Local P CE 2/1/2008 <br /> Non- West/East Marine View Drive Bike-Ped Improvements T CN 8/1/2008 STP(E) 426 PSMF 450 85 961 500 <br /> Motorized West and East Marine View Drive 0 <br /> Everett Avenue to North Broadway <br /> Design,cosntruct new and upgraded facilities for bikes and pads Totals 5011 100 1,051 500 0 0 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.