My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6040
>
Resolutions
>
Resolution 6040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2016 11:57:43 AM
Creation date
11/17/2016 11:57:14 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
6040
Date
7/9/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Department of Transportation Page 7 Six-year Transportation Improvement Program <br /> Agency Everett From 2009 to 2014 <br /> County No. 31 Hearing Date: <br /> City No. 420 Adoption Date: <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title RIW <br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase _ Code Funds Funds Funds (2009) (2010) (2011) 6th Type (MMP1Y) <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 19 4 2 phases in project 05 P 1.7 C PE 8/1/2012 50 50 50 <br /> Local P CN 6/1/2013 250 250 250 <br /> Street Upper Ridge&Lower Ridge Rd.street improvemt. T <br /> Constr. Upper Ridge,Lower Ridge,74th St.,76th St 0 <br /> Beverly Lane to 78th Street <br /> Design and construct street improvements Totals 300 300 0 0 0 300 1 <br /> 19 5 2 phases in project 05 P 0.2 C PE 8/1/2009 200 200 200 <br /> Local P CN 6/1/2010 1800 1800 1800 <br /> Street Simpson Site Access Improvements T <br /> Constr. Simpson Site,Snohomish Riverfront 0 <br /> Connection between Landfill and Simpson Sites <br /> Design and construct street improvements Totals - _ 2,000 2,000 200 1800_ 0 0 <br /> 19 1 1 phase in project 12 P 00 C CN 5/1/2009 240 240 40 40 40 120 <br /> Local Traffic Signal Interconnect P <br /> Traffic Various locations within City limits T <br /> Signal Various streets to Various streets 0 <br /> Construct traffic signal interconnect Totals 240 240 40 40 40 120 <br /> 19 2 2 phases in project 12 S 00 C PE 1/1/2009 <br /> Local Traffic Signal Improvements(City-wide) P CN 6/1/2009 900 900 150 150 150 450 <br /> Traffic Various locations within City limits T <br /> Signal Various streets to Various streets <br /> Design,construct,install traffic signals _ Totals 900 900 150 150 150 450 <br /> 19 3 2 phases in project 12 P 0 0 PE 1/1/2009 60 60 10 10 10 30+ <br /> Local ITMS/Transit TSP Upgrades CN 7/1/2009 540 540 90 90 90 270 <br /> Traffic various locations city-wide; Evergreen Way BRT Corridor <br /> Signal various traffic signals;Evergreen Way(128th to Pacific) <br /> Implement ITMS system;TSP improvements Totals _ 600 600 100 100 100 300 <br /> 19 1 2 phases in project 6 S 00 C PE 1/1/2009 J <br /> Local Neighborhood Block Grants P CN 9/1/2009 CDBG 360 360 60 60 60 180 No <br /> Neighbor. Various locations within City limits T <br /> Projects Various streets to Various streets 0 <br /> _Construct improvements in various neighborhoods Totals 360 360 60 60 60 180 <br /> 19 2 -2 phases in project 6 —P - 00 ' C PE 17172009 - <br /> Local Neighborhood Traffic Mitigation Studies-Projects P CN 5/1/2009 2,400 2,400 400 400 400 1,200 <br /> Neighbor. Various locations within City limits T <br /> Projects Various streets 0 <br /> Install traffic enhancements in neighborhoods _ Totals 2,400 2,400 400 400 400 1200 <br /> 19 3 2 phases in project 6 P 00 C PE 1/1/2009 <br /> Local Residential Sidewalks P CN 5/1/2009 2,400 2,400 400 400 400 1,200 <br /> Neighbor. Various locations T <br /> Projects Various streets 0 <br /> Install sidewalks on residential streets _ Totals 2,400 2,400 400 400 400 1200 <br /> 19 1 2 phases in project 06 S 00 P PE 3/1/2009 30 30 5 5 5 15 <br /> Local O CN 7/1/2009 150 150 25 25 25 75 <br /> Landscap. City Entryway Landscaping and Signs <br /> Various Entryway Corridors within City limits <br /> Various Entryway to Various Entryway <br /> Design and install gateway landscaping and signs • Totals 180 180 30 30 30 90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.