My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6040
>
Resolutions
>
Resolution 6040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2016 11:57:43 AM
Creation date
11/17/2016 11:57:14 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
6040
Date
7/9/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> 2009 To 2014 Six-year Transportation Improvement Program <br /> Interstates Local Access and Other Projects <br /> 1. 1-5/41"St.Interchange&Related Corridor Improvements 1. BNSF RR Safety Improvements (Safety) <br /> 2. I-5/Downtown Everett Interchange Access Improvements 2. Local Roadway Safety Projects (Safety) <br /> (Everett Ave.Hewitt Ave.,US 2,Pacific Ave.) 3. Safe Routes to Schools (Safety) <br /> 3. I-5/100"'Street SE HOV Access/Undercrossing <br /> 4. NB Everett Mall Way/SB I-5 Onramp 1. Annual Street Overlay Program (Maintenance) <br /> 5. 1-5/Smith Island Interchange(12"St.or SR 529) 2. Sidewalk Repair and Replacement (Maintenance) <br /> 6. I-5/East Marine View Drive Interchange Improvements 3. Pavement Marking Projects (Maintenance) <br /> 7. 1-5 HOV Lanes(US 2 to SR 528) <br /> 8. I-5/l28"'Street Interchange 1. 106th Place SE Improvements (Street) <br /> 9. I-5/128"Street HOV Ramps(Mariner PNR) 2. 3rd Avenue SE Improvements (Street) <br /> 10. 1-5/112th Street Interchange Study 3. Local Street Improvements (Street) <br /> 4. Upper and Lower Ridge Rd.Improvements (Street) <br /> Freeways 5. Simpson Site Access Improvements (Street) <br /> 1. US 2 Improvements(1-5 to SR 204) <br /> 2. SR 526/Hardeson Road Interchange 1. Traffic Signal Interconnect (Traffic Signals) <br /> 3. SR 526 Extension Study(I-5 to US 2) 2. Traffic Signal Improvements (Traffic Signals) <br /> 4. SR 526/Evergreen Way Interchange 3. ITMS/TSP Signal Upgrades (Traffic Signals) <br /> 5. SR 526/40th Avenue W.Intersection <br /> 6. SR 529/Smith Island Ramps I. Neighborhood Block Grants (Neighborhoods) <br /> 2. Neighborhood Traffic Studies/Projects (Neighborhoods) <br /> Principal Arterials 3. Residential Sidewalks (Neighborhoods) <br /> I. East Marine View Drive Improvements(I-5 to SR 529) <br /> 2. Broadway/Beverly Blvd.Intersection Improvements 1. City Entryway Landscaping/Signs (Landscaping) <br /> 3. W.Marine View Dr./Rucker/41"Freight Route Improv. <br /> 4. Broadway Corridor Improvements(SR 529 to SR 526) Non-motorized Trail/Path Improvements <br /> 5. SR 99/Evergreen Way BRT Improv.(128th to Pacific) 1. Riverfront Walkway Phase II <br /> 6. Arterial Safety Projects(Forest Park,I-5 and Pacific,etc.) 2. East Grand Walkway Connection <br /> 7. Pacific Avenue/BNSF Grade Crossing Improvements 3. 7t"Avenue SE Ped/Bike Improvements(92nd to 112'h) <br /> 8. Evergreen Way Improvements(115'"St.SW to Airport Rd.) 4. Henry M.Jackson Ped.Bridge <br /> 9. I-5 to Port of Everett Truck Route 5. Riverside Bus Pk.Ped.Trail(16th to N.Broadway) <br /> 10. Mukilteo Blvd.Safety Imp.(Friday Ave.to City Limits) 6. West/East Marine View Drive Bike-Ped Improvements <br /> 11. Arterial Needs Study 7. 47'"Street Ped Improvements(Evergreen to B.F.Ln.) <br /> 12. Principal Arterial Expansion&Streetscaping 8. Pigeon Creek No. 1/BNSF Rail Line Crossing <br /> 9. Grand Avenue/North Marina Ped-Bike Connection <br /> Minor Arterials 10. Shoreline Access Imp.(Various Locations) <br /> 1. 112th Street SW-SE Street Improvements(1-5 to SR 527) 11. Snohomish River Bike/Ped.Bridge <br /> 2. 116t"Street SE Street Improvements(SR 527 to 351°) 12. Pigeon Creek Rd.No. 1 Improvements <br /> 3. 100'"Street SW Street Improv.(4th Ave.W.to Airport) 13. Lowell Sno.River Rd. Bike/Ped Connection <br /> 4. Casino Rd.Safety Improvements(Evergreen to 5'"Ave.) 14. Everett Non-motorized Projects(Various Locations) <br /> 5. 4t"Avenue West Improvements(104th to 112th) <br /> 6. Colby Avenue Streetscaping Transit <br /> 7. 100`"Street SE Improvements(SR 527 to 7`"Ave SE) 1. Bus Replacements-2009 to 2014 <br /> 8. 100th Street SE Improvements(7ih Ave to Evergreen) 2. Bus Fleet Expansion <br /> 9. 110t Street SE Improvements(SR 527 to 35th St.) 3. Implementation of State CTR law <br /> 10. Lenora St./Lowell-River Rd./BNSF Rail Line Oxing 4. Midtown Transit Center <br /> 11. Minor Arterial Expansion and Streetscaping 5. Bicycle Station Project <br /> 6. Base Relocation <br /> Collector Arterials 7. Southeast Transit Center <br /> 1. East Everett Avenue/BNSF Overcrossing 8. SWIFT Northern Terminal <br /> 2. Holly Dr.Non-motorized Imp.(4th Ave.W.to 92"d) 9. Marysville Paratransit Shuttle <br /> 3. Bond Street Ped/Bike Impr.(Kromer to Terminal) 10. Transit Priority Equipment <br /> 4. Chestnut St./Eclipse Mill Rd.Impr.(Pacific to 36th) 11. Riverfront to Harborfront Connector <br /> 5. Silver Lake Road-121"Street SE Ped.Improvements <br /> 6. 36'"St./Smith St.Ped,Bike,Landscape Improvements HOVProiects <br /> 7. 36'"St./BNSF At-grade Rail Crossing Closure 1. Everett Station PNR Parking Structure <br /> 8. 36th St.(or vicinity)/BNSF Rail Line Ped/Bike Crossing <br /> 9. 37th Street Improvements(Rucker to Broadway) Projects in bold type not included in 2008-2013 TIP <br /> 10. Smith Island Bike and Pedestrian Improvements <br /> 11. Collector Arterial Expansion&Streetscaping <br />
The URL can be used to link to this page
Your browser does not support the video tag.