Laserfiche WebLink
CITY OF EVERETT 2009 TO 2014 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM <br /> Project PROJECT PRIO- PE RNV CONST. Est 2009-14 LEAD MAP <br /> Number TYPE RITY PROJECT NAME TERMINI START START START Expenditures AGENCY NO. <br /> 1 Interstate 1 1-5-41st Street Interchange&Related Corridor Improvements 41st Street/1-5 and Vicinity Jul.03 Apr.06 1,000,000 WSDOT 1 <br /> 2 Interstate 2 1-5 Downtown interchange improvements Pacific,Everett,Hewitt Aves.,and US 2 Jan.11 Jun.12 Sep.13 28,500,000 • EVERETT 2 <br /> 3 Interstate 3 1-5/100th Street SE HOV Access/Undercrossing I-5 at 100th Street SE Jul.11 Jan.12 Jan.13 68,500,000 • EVERETT 3 <br /> 4 Interstate 4 NB Everett Mall Way to SB I-5 Onramp Everett Mall Way to southbound 1-5 Jan.10 May.11 3,500,000 • WSDOT 4 <br /> 5 Interstate 5 1-5/Smith Island interchange 12th Ave.NE or SR 529 Jan.11 Jun.12 Jul.13 10,000,000 * EVERETT 5 <br /> 6 Interstate 6 1-5/East Marine View Drive Interchange 1-5 at East Marine View Drive Jan.12 Jun.13 Jun.14 16,000,000 • EVERETT 6 <br /> 7 Interstate 7 I-5 HOV Lanes US 2 to SR 528 Jan.13 Jun.17 May.19 5,000,000 • WSDOT 7 <br /> 8 Interstate 8 15/128th Street Interchange 1-5 at 128th Street Jan.13 Jan.19 May.21 2,000,000 • WSDOT 8 <br /> 9 Interstate 9 1-5/128th Street HOV Ramps(Manner PNR) ,I-5 at 128th Street/Mariner PNR Jan.10 Jan.12 May.14 6,000,000 * WSDOT 9 <br /> 10 Interstate 10 1-5/112th Street Interchange Study 1-5 at 112th Street SE Jan.14 3,000,000 • WSDOT 10 <br /> 11 Freeway 1 US 2 Improvements 1-5 to SR 204 Jun.13 Jun.15 Jun.16 3,000,000 * WSDOT 11 <br /> 12 Freeway 2 SR 526/Hardeson Road Interchange SR 526 at Hardeson Road Jun.13 Jun.15 Jun.17 2,000,000 • WSDOT 12 <br /> 13 Freeway 3 SR 526 Extension Study SR 526 to US 2 Jun.11 8,500,000 ' WSDOT 13 <br /> 14 Freeway 4 SR 526/Evergreen Way Interchange SR 526 at Evergreen Way Jun.13 Jun.15 Jun.17 38,000,000 • WSDOT 14 <br /> 15 Freeway 5 SR 526/40th Avenue West Intersection SR 526 and 40th Avenue West Jun.13 Jun.15 Jun.16 500,000 * EVERETT 15 <br /> 16 Freeway 6 SR 529/Smith Island Ramps SR 529 at Smith Island Jun.13 Jun.15 Jun.17 250,000 * WSDOT 16 <br /> 17 Principal Arterial 1 East Marine View Drive Improvements North Broadway to Interstate 5 Mar.03 Jul.05 Mar.07 2,000,000 EVERETT 17 <br /> 18 Principal Arterial 2 Broadway/Beverly Blvd.Intersection Impr. So.Broadway at Beverly Blvd. Oct.04 Jul.08 250,000 EVERETT 18 <br /> 19 Principal Arterial 3 W.Marine View Dr./Rucker Ave./41st St.Freight Route W.Marine View Dr.,Rucker Ave,41st Street Sep.10 Sep.11 Jun.13 4,280,000 • EVERETT 19 <br /> 20 Principal Arterial 4 Broadway Corridor Improvements SR 526 to SR 529 Feb.10 Feb.11 Jun.12 4,000,000 • EVERETT 20 <br /> 21 Principal Arterial 5 SR 99/Evergreen Way Bus Rapid Transit Corridor 128th Street to Everett Station May.08 Jan.09 2,150,000 EVERETT 21 <br /> 22 Principal Arterial 6 Arterial Safety Projects(Forest Pk entrances;1-5 and Pacific) Various Locations Jan.10 Mar.11 900,000 • EVERETT <br /> 23 Principal Arterial 7 Pacific Avenue/BNSF Grade Crossing Improvements Pacific Avenue and Chestnut St. Jan.11 Jun.12 Jun.14 6,000,000 • EVERETT 22 <br /> 24 Principal Arterial 8 Evergreen Way Improvements,115th to Airport Road _11500 block to Airport Road Jan.11 Jul.12 425,000 • EVERETT 23 <br /> 25 Principal Arterial 9 Interstate 5 to Port of Everett Truck Route Plan Port of Everett to 15 Jan.11 200,000 • EVERETT <br /> 26 Principal Arterial 10 Mukilteo Blvd.Safety Improvements Friday Avenue to city limits Feb.12 Apr.13 3,300,000 EVERETT 24 <br /> 27 Principal Arterial 11 Arterial Needs Study Various arterials within city limits Feb.10 200,000 • EVERETT <br /> 28 Principal Arterial 12 Principal Arterial Expansion and Streetscaping Various Locations Feb.10 Apr.11 400,000 • EVERETT <br /> 29 Minor Arterial 1 112th Street SE Improvements Interstate 5 to 19th Avenue SE Jun.07 Apr.09 Jul.10 4,650,000 EVERETT 25 <br /> 30 Minor Arterial 2 116th Street SE Improvements SR 527 to 35th Street SE Jan.10 Jul.11 May.12 3,800,000 ' EVERETT 26 <br /> 31 Minor Arterial 3 100th Street SW Improvements Airport Road to 4th Avenue West Feb.10 Jun.11 3,600,000 • EVERETT 27 <br /> 32 Minor Arterial 4 Casino Road at 5th Ave.W.Road Intersection Improvements Casino Road at Hardeson Road Mar.11 Mar.12 May.13 500,000 * EVERETT 28 <br /> 33 Minor Arterial 5 4th Avenue West Widening and Improvement 104th Street to 112th St.SW Jan.11 Jan.12 May.13 9,000,000 • SNO.CNTY. 29 <br /> 34 Minor Arterial 6 Colby Avenue Streetscape Improvements 19th Street to 41st Street Feb.10 May.11 3,000,000 • EVERETT 30 <br /> 35 Minor Arterial 7 100th Street SE Improvements SR 527 to 7th Avenue SE Jan.14 Jan.16 May.18 1,000,000 • EVERETT 31 <br /> 36 Minor Arterial 8 100th Street SE Improvements 7th Avenue SE to Evergreen Way Jan.14 Jan.16 May.18 1,000,000 • EVERETT 32 <br /> 37 Minor Arterial 9 110th Street SE Improvements SR 527 to 35th Street SE Jan.11 Jan.13 May.15 2,000,000 • EVERETT 33 <br /> 38 Minor Arterial 10 Lenora St./BNSF Rail Line Overcrossing Lenora St.&Lowell Sno.River Rd. Jul.11 Jul.13 May 15 1,800,000 • EVERETT 34 <br /> 39 Minor Arterial 11 Minor Arterial Expansions and Streetscaping Various Locations Jan.11 Jan.13 May.15 400,000 * EVERETT <br /> 40 Collector Arterial 1 East Everett Ave./BNSF Overcrossing East Grand Ave.to Railway Ave. Jan.12 Sep.13 Jun.14 7,000,000 • EVERETT 35 <br /> 41 Collector Arterial 2 Holly Drive Non-Motorized Improvements 4th Avenue W.to 92nd Street Jul.07 Oct.08 300,000 • EVERETT 36 <br /> 42 Collector Arterial 3 Bond Street Ped/Bike Improvements Kromer to Terminal Ave. Jun.03 Jan.04 Jul.08 100,000 EVERETT 37 <br /> 43 Collector Arterial 4 Chestnut St./Eclipse Mill Rd.Improvements Pacific Ave.to 36th Street Jan.10 Jun.11 3,350,000 • EVERETT 38 <br /> 44 Collector Arterial 5 Silver Lake Road-121st St.SE Ped.Improv. 112th Street to SR 527 Jun.10 Jun.11 Jul.12 1,500,000 • EVERETT 39 <br /> 45 Collector Arterial 6 36th Street/Smith Street Ped,Bike&Lndscp.Improv. Broadway to Eclipse Mill Rd.;36th to 33rd Jan.10 May.11 May.12 1,000,000 • EVERETT 40 <br /> 46 Collector Arterial 7 36th Street/BNSF At-grade Rail Crossing Closure 36th St.&BNSF Rail Line Jan.09 Sep.09 Jun.10 200,000 EVERETT 41. <br /> 47 Collector Arterial 8 36th Street(or vicinityyBNSF Rail Line Ped/Bike Crossing 36th,38th,or 39th&BNSF Rail Line Jan.08 Nov.08 Jun.10 2,800,000 • EVERETT 42 <br /> 48 Collector Arterial 9 37th Street improvements and traffic signal Rucker Avenue to Wetmore Ave. Jun.10 Jun.11 500,000 • EVERETT 43 <br /> 49 Collector Arterial 10 Smith Island Bike/Ped improvements Various arterials on Smith Island Jan.10 Jan.11 May 12 1,000,000 * EVERETT 44 <br /> 50 Collector Arterial 11 Collector Arterial Expansion and Streetscaping Various Locations Jun.10 Jun.11 Jul.12 400,000 • EVERETT <br /> 268,755,000 <br /> 'A portion or all of the funding for this project has not yet been committed. <br /> NOTE: Projects shown in bold type were not included in the 2007-2012 Six-Year TIP. <br />