Laserfiche WebLink
CITY OF EVERETT 2009 TO 2014 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM f <br /> Project PROJECT PRIO- PE RNV CONST. Est.2009-14 LEAD MAP <br /> Number TYPE RITY PROJECT NAME TERMINI START START START Expenditures AGENCY NO. <br /> 51 Local Access-SAF 1 BNSF RR safety improvements Various locations Jan.09 Jun.09 600,000 EVERETT <br /> 52 Local Access-SAF 2 Local Roadway Safety Projects Various locations Jan.09 Jun.09 120,000 • EVERETT <br /> 53 Local Access-SAP 3 Safe Routes to Schools Various locations Jan.09 Apr.10 600,000 • EVERETT <br /> 54 Local Access-PR/M 1 Annual Street Overlay Program Various streets Jan.09 Jul.09 6,000,000 EVERETT <br /> 55 Local Access-PR/M 2 Sidewalk repair and replacement Various locations Jan.09 May 09 360,000 EVERETT <br /> 56 Local Access-PR/M 3 Pavement Marking Project Various locations Jan.09 May 09 210,000 EVERETT <br /> 57 Local Access-STR 1 106th Place SE Improvements 16th Avenue SE to 19th Avenue SE Nov.10 Jun.11 650,000 • EVERETT 45 <br /> 58 Local Access-STR 2 3rd Avenue SE Street Improvements 92nd Street SE to 95th Street SE Jan.11 Apr.12 675,000 • EVERETT 46 <br /> 59 Local Access-STR 3 Local Street Improvements Pine,Fulton,California Jul.11 May 12 580,000 • EVERETT <br /> 60 Local Access-STR 4 Upper&Lower Ridge Rd.Str.Improv. 74th Street to 78th Street Aug.12 Jun.13 300,000 • EVERETT 47 <br /> 61 Local Access-STR 5 Simpson Site Access Improvements Simpson Site,Snohomish Riverfront Aug.09 Jun.10 2,000,000 • EVERETT 48 <br /> 62 Local Access-SIG 1 _Traffic Signal Interconnect Various locations May.09 240,000 EVERETT <br /> 63 Local Access-SIG _ 2 Traffic Signal Improvements Various locations Jan.09 Jun.09 900,000 EVERETT <br /> 64 Local Access-SIG 3 ITMS/TSP Upgrades Various signals Jan.09 Jul.09 600,000 EVERETT <br /> 65 Local Access-NEI 1 _Neighborhood Block Grants Various locations 1 Jan.09 May.09 360,000 • EVERETT <br /> 66 Local Access-NEI 2 Neighb.Traffic Mitigation Studies&Projects Various locations Jan.09 May.09 2,400,000 • EVERETT <br /> 67 Local Access-NEI 3 Residential Sidewalks Various locations Jan.09 May.09 2,400,000 • EVERETT <br /> 68 Local Access-LS 1 City Entryway Landscaping and Signs Various entry corridors into the City ! Mar.09 ' Jul.09 180,000 • EVERETT <br /> 69 Local Access-NM 1 Riverfront Walkway Phase II 41st Street to Smith Street May 08 May.09 55,000 EVERETT 49 <br /> 70 Local Access-NM 2 East Grand Walkway Connection East Grand and I-5 Jan.10 Jul 11 850,000 • EVERETT 50 <br /> 71 Local Access-NM 3 7th Avenue SE Ped/Bike Improvements 9nd Street SE to 112th Street SE Jun.07 Aug.08 100,000 EVERETT 51 <br /> 72 Local Access-NM 4 Henry Jackson Park Ped Bridge E.Marine View Drive to Riverside Bus.Park Jan.07 May.10 Jul.11 2,700,000 • EVERETT 52 <br /> 73 Local Access-NM 5 Riverside Business Park Ped trail Snohomish River at Riverside Business Park Apr.09 Apr.10 700,000 • EVERETT 53 <br /> 74 Local Access-NM _ 6 West/East Marine View Drive Bike-Ped Improvements Alverson Bridge to North Broadway Aug.09 Apr.10 500,000 • EVERETT 54 <br /> 75 Local Access-NM 7 47th Street Pedestrian Improvements Evergreen Way to Black Forest Lane Jan.11 Jun.12 500,000 • EVERETT 55 <br /> 76 Local Access-NM 8 Pigeon Creek No.1/BNSF Crossing Port of Everett Public Access Walkway to Pigeon Crk Rd Jan.10 Jul.11 Apr.12 925,000 • EVERETT 56 <br /> 77 Local Access-NM 9 Grand Ave./N.Marina Ped-Bike Connection Grand Ave.to W.Marine View Drive Jan.12 Jan.13 May.14 1,050,000 • EVERETT <br /> 78 Local Access-NM 10 Shoreline Access Improvements Various locations Apr.12 Apr.13 2,400,000 • EVERETT <br /> 79 Local Access-NM 11 Snohomish River Bike and Ped.Bridge E.Marine View Drive to Smith Island Nov.01 Apr.12 9,000,000 • EVERETT 57 <br /> 80 Local Access-NM 12 Pigeon Creek Road No.1 Improvements Mukilteo Blvd to BNSF R/W Apr.12 _ Apr.14 1,000,000 • EVERETT 58 <br /> 81 Local Access-NM 13 Lowell Snohomish River Rd.Bike/Ped Connection Rotary Park to city limits May.11 Aug.12 Sep.13 1,500,000 * EVERETT 59 <br /> 82 Local Access-NM 14 Everett Non-Motorized Projects•• Various locations May.09 Aug.10 Sep.11 760,000 • EVERETT <br /> **Candidate non-motorized improvements include Norton Avenue,Olympic Drive,Smith Avenue,Wall Street, 41,215,000 <br /> Lowell River Road,36th Street,Sharon Drive,Friday Avenue,Lowell Road-Lenora Street,90th Street SW, <br /> 93rd Street SW,Dorn Avenue-92nd Street SE,7th Avenue SE,3rd Avenue SE,Dakota Way,Hollowdale Place,Cady Road, <br /> Fleming Street,75th Street,100th Street SW,and Shore Avenue/Edgewater Beach and various shoreline public access projects <br /> 'A portion or all of the funding for this project has not yet been committed. NOTE: Projects shown in bold type were not included in the 2008-2013 Six-year TIP. <br /> Local Access Codes: SAF=Safety; PR/M=Preservation and Maintenance; STR=Street construction; SIG=Traffic Signal Improvement; <br /> NEI=Neighborhood Projects; LS=Landscaping Project; NM=Non-Motorized Improvement <br />