Laserfiche WebLink
Page 1 Six-year Transportation Improvement Program <br /> Agency Everett From 2009 to 2014 <br /> County No. 31 Hearing Date: <br /> City No. 420 Adoption Date: <br /> MPO PSRC _ _ Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title R/W <br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E.Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code, Phase Code Funds Funds Funds (2009) (2010) (2011) 6th Type (MM/YY) <br /> 2 3 4 5 8 7 6 9 10 _ 11 12 13 14 15 16 17 18 19 20 21 <br /> 11 1 3 phases in project 3 S 0.3 0 PE 7/1/2003 Disc. 1,000 WSDOT 4,400 500 5,900 <br /> Interstate 5/630 P EA <br /> I-5/41st Street SE Interchange&Related Corridor Improvements T CN 4/1/2006 WSDOT 42,844 42,844 <br /> 1-5,41st Street CN Disc. 4,800 4,800 1,000 <br /> S.3rd Ave.to Colby Ave;38th Street to 43rd Street 0 <br /> Design and construct interchange access improvements _ Totals - 5,800 47,244 500 53,544 1,000 0 0 0 ' <br /> 11 2 3 phases in project 3 P 1.1 0 PE 1/1/2011 WSDOT 3,500 3,500 2,000 1,500 <br /> Interstate RW 6/1/2012 WSDOT 2,000 2.000 2,000 <br /> I-5/Downtown Everett Interchange Access Improvements CN 9/1/2013 WSDOT 23,000 23,000 13,000 <br /> 1-5 at Pacific,Hewitt,Everett Avenues <br /> Pacific Avenue to Everett Avenue <br /> Ramp and other arterial improvements at downtown interchanges _ Totals _ 28,500 28,500 0 0 2,000 16,500 <br /> 11 3 3 phases in project 1 P 0.1 0 PE 7/12011 WSDOT 5,000 5,000 2,500 2,500 <br /> Interstate RW 1/1/2012 WSDOT 2,000 2,000 2,000 <br /> 1-5/100th Street SE HOV Access/Undercrossing CN 1/1/2013 WSDOT 61,500 61,500 61,500 <br /> I5,100th Street SE <br /> SR 527 to South Everett Transit Center area <br /> Design and construct HOV access/undercrossing Totals _ 68,500 68,500 0 0 2,500 66,000 <br /> 11 4 2 phases in project 1 P 0.5 0 PE 1/1/2010 WSDOT 500 500 500 <br /> Interstate 5/099 <br /> IS/Everett Mall Way Onramp CN 5/1/2011 WSDOT 3,000 3,000 3,000 <br /> NB Everett Mall Way to SB 1-5 <br /> NB Everett Mall Way to SB 15 <br /> Design and construct interstate onramp Totals 3,500 3,500 0 500 3,000 0 <br /> 11 5 3 phases in project 1 P 0.5 0 PE 1/1/2011 WSDOT 1,000 1,000 2,000 1,000 1,000 <br /> Interstate RW 6/1/2012 WSDOT 1,000 2,000 3,000 3,000 <br /> 15/Smith Island Freeway Interchange CN 7/1/2013 WSDOT 8,000 12,000 20,000 20,000 <br /> 1-5 at 12th St.NE or SR 529 <br /> 12th St.NE or SR 529 <br /> Design and construct freeway interchange _Totals 1 10,000 15,000 25,000 0 0 1,000 24,000 <br /> 11 6 3 phases in project 3 P 0.3 0 PE 1/1/2012 WSDOT 3,000 1,000 4,000 4,000 <br /> Interstate RW 6/1/2013 WSDOT 1,500 500 2,000 2,000 <br /> IS/East Marine View Dr. Frwy.Interchange CN 6/1/2014 WSDOT 17,000 7,000 24,000 10,000 <br /> IS at East Marine View Drive FMSIB 5,000 5.000 <br /> I5 a E.Marine View Dr. <br /> Add on and off-ramp to and from the north _ _ Totals 26,500 8,500 35,000 0 0 0 16,000 <br /> 11 7 3 phases in project 4 P 5.6 0 PE 1/1/2013 WSDOT 18,300 18,300 5,000 <br /> Interstate Various RW 6/1/2017 WSDOT 20,000 20,000 <br /> IS Median HOV Lanes CN 5/1/2019 WSDOT 191,700 191,700 <br /> Interstate 5 <br /> US 2 to SR 528 <br /> Design and construct Interstate median HOV lanes Totals_ 230,000 230,000 0 0 0 5,000 <br /> 11 8 3 phases in project 3 P 0.3 0 PE 9/12013 WSDOT 14,000 14,000 2,000 <br /> Interstate RW 1/1/2019 WSDOT 25,000 25,000 <br /> IS/128th Street Interchange CN 5/12021 WSDOT 140,000 140,000 <br /> 1-5 at 128th Street <br /> IS at 128th Street <br /> Design and construct single-point urban interchange Totals 179,000 179,000 0 0 0 2,000 <br /> 11 11 3 phases in project 3 P 0.3 C PE 1/1/2010 WSDOT 2,000 2,000 1,000 1,000 <br /> Interstate P RW 1/1/2012 WSDOT 1,000 1,000 1,000 <br /> 15/128th Street HOV Ramps T CN 5/1/2014 WSDOT 12,000 12,000 3,000 <br /> IS at 128th Street and Mariner PNR 0 <br /> IS at 128th Street and Mariner PNR <br /> Add HOV ramps to and from Mariner PNR 101 128th St. Totals 15,000- 0 15,000 0 1,000 2,000 3,000 <br /> 11 12 3 phases in project 3 P 0.2 0 PE 1/1/2014 WSDOT 3,000 3,000 3,000 <br /> Interstate Various <br /> IS/112th Street Interchange Study <br /> Interstate 5 at 112th Street SE <br /> Interstate 5 at 112th Street SE <br /> Study possible interchange improvements Totals 3,000 0 3,000 0 0 0 3,000 <br />