|
Page 1 Six-year Transportation Improvement Program
<br /> Agency Everett From 2009 to 2014
<br /> County No. 31 Hearing Date:
<br /> City No. 420 Adoption Date:
<br /> MPO PSRC _ _ Resolution No.
<br /> Project Identification Project Costs in Thousands of Dollars Federally Funded
<br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only
<br /> B. Bridge No. Federal Funding Local Agency
<br /> C. Project Title R/W
<br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required
<br /> Functional Priority E.Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date
<br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code, Phase Code Funds Funds Funds (2009) (2010) (2011) 6th Type (MM/YY)
<br /> 2 3 4 5 8 7 6 9 10 _ 11 12 13 14 15 16 17 18 19 20 21
<br /> 11 1 3 phases in project 3 S 0.3 0 PE 7/1/2003 Disc. 1,000 WSDOT 4,400 500 5,900
<br /> Interstate 5/630 P EA
<br /> I-5/41st Street SE Interchange&Related Corridor Improvements T CN 4/1/2006 WSDOT 42,844 42,844
<br /> 1-5,41st Street CN Disc. 4,800 4,800 1,000
<br /> S.3rd Ave.to Colby Ave;38th Street to 43rd Street 0
<br /> Design and construct interchange access improvements _ Totals - 5,800 47,244 500 53,544 1,000 0 0 0 '
<br /> 11 2 3 phases in project 3 P 1.1 0 PE 1/1/2011 WSDOT 3,500 3,500 2,000 1,500
<br /> Interstate RW 6/1/2012 WSDOT 2,000 2.000 2,000
<br /> I-5/Downtown Everett Interchange Access Improvements CN 9/1/2013 WSDOT 23,000 23,000 13,000
<br /> 1-5 at Pacific,Hewitt,Everett Avenues
<br /> Pacific Avenue to Everett Avenue
<br /> Ramp and other arterial improvements at downtown interchanges _ Totals _ 28,500 28,500 0 0 2,000 16,500
<br /> 11 3 3 phases in project 1 P 0.1 0 PE 7/12011 WSDOT 5,000 5,000 2,500 2,500
<br /> Interstate RW 1/1/2012 WSDOT 2,000 2,000 2,000
<br /> 1-5/100th Street SE HOV Access/Undercrossing CN 1/1/2013 WSDOT 61,500 61,500 61,500
<br /> I5,100th Street SE
<br /> SR 527 to South Everett Transit Center area
<br /> Design and construct HOV access/undercrossing Totals _ 68,500 68,500 0 0 2,500 66,000
<br /> 11 4 2 phases in project 1 P 0.5 0 PE 1/1/2010 WSDOT 500 500 500
<br /> Interstate 5/099
<br /> IS/Everett Mall Way Onramp CN 5/1/2011 WSDOT 3,000 3,000 3,000
<br /> NB Everett Mall Way to SB 1-5
<br /> NB Everett Mall Way to SB 15
<br /> Design and construct interstate onramp Totals 3,500 3,500 0 500 3,000 0
<br /> 11 5 3 phases in project 1 P 0.5 0 PE 1/1/2011 WSDOT 1,000 1,000 2,000 1,000 1,000
<br /> Interstate RW 6/1/2012 WSDOT 1,000 2,000 3,000 3,000
<br /> 15/Smith Island Freeway Interchange CN 7/1/2013 WSDOT 8,000 12,000 20,000 20,000
<br /> 1-5 at 12th St.NE or SR 529
<br /> 12th St.NE or SR 529
<br /> Design and construct freeway interchange _Totals 1 10,000 15,000 25,000 0 0 1,000 24,000
<br /> 11 6 3 phases in project 3 P 0.3 0 PE 1/1/2012 WSDOT 3,000 1,000 4,000 4,000
<br /> Interstate RW 6/1/2013 WSDOT 1,500 500 2,000 2,000
<br /> IS/East Marine View Dr. Frwy.Interchange CN 6/1/2014 WSDOT 17,000 7,000 24,000 10,000
<br /> IS at East Marine View Drive FMSIB 5,000 5.000
<br /> I5 a E.Marine View Dr.
<br /> Add on and off-ramp to and from the north _ _ Totals 26,500 8,500 35,000 0 0 0 16,000
<br /> 11 7 3 phases in project 4 P 5.6 0 PE 1/1/2013 WSDOT 18,300 18,300 5,000
<br /> Interstate Various RW 6/1/2017 WSDOT 20,000 20,000
<br /> IS Median HOV Lanes CN 5/1/2019 WSDOT 191,700 191,700
<br /> Interstate 5
<br /> US 2 to SR 528
<br /> Design and construct Interstate median HOV lanes Totals_ 230,000 230,000 0 0 0 5,000
<br /> 11 8 3 phases in project 3 P 0.3 0 PE 9/12013 WSDOT 14,000 14,000 2,000
<br /> Interstate RW 1/1/2019 WSDOT 25,000 25,000
<br /> IS/128th Street Interchange CN 5/12021 WSDOT 140,000 140,000
<br /> 1-5 at 128th Street
<br /> IS at 128th Street
<br /> Design and construct single-point urban interchange Totals 179,000 179,000 0 0 0 2,000
<br /> 11 11 3 phases in project 3 P 0.3 C PE 1/1/2010 WSDOT 2,000 2,000 1,000 1,000
<br /> Interstate P RW 1/1/2012 WSDOT 1,000 1,000 1,000
<br /> 15/128th Street HOV Ramps T CN 5/1/2014 WSDOT 12,000 12,000 3,000
<br /> IS at 128th Street and Mariner PNR 0
<br /> IS at 128th Street and Mariner PNR
<br /> Add HOV ramps to and from Mariner PNR 101 128th St. Totals 15,000- 0 15,000 0 1,000 2,000 3,000
<br /> 11 12 3 phases in project 3 P 0.2 0 PE 1/1/2014 WSDOT 3,000 3,000 3,000
<br /> Interstate Various
<br /> IS/112th Street Interchange Study
<br /> Interstate 5 at 112th Street SE
<br /> Interstate 5 at 112th Street SE
<br /> Study possible interchange improvements Totals 3,000 0 3,000 0 0 0 3,000
<br />
|