My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment 2 Tetra Tech Inc.
>
Contracts
>
6 Years Then Destroy
>
2018
>
Amendment 2 Tetra Tech Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2016 11:45:31 AM
Creation date
11/22/2016 11:45:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Tetra Tech Inc.
Approval Date
11/21/2016
Council Approval Date
11/2/2016
End Date
12/31/2018
Department
Public Works
Department Project Manager
Mike Robinson
Subject / Project Title
WFP PLC Replacement Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Total Compensation
$166,770.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o <br /> City of Everett,WFP PLC 135-12589-12002 <br /> Additional Services <br /> EXHIBIT Al <br /> SCOPE OF WORK <br /> To maintain system operation, to satisfy newly developed buy-off protocols for the PLC replacement <br /> work,and to further enhance and support the networking and computer systems;Tetra Tech has been <br /> requested to provide this Proposal to perform additional work beyond the original Scope of work in <br /> order to complete the project.This Proposal is offered to obtain fair and reasonable compensation for <br /> these additional efforts. <br /> Additional scope items for Everett WFP PLC Replacement Project: <br /> TASK 11 Additional meetings: <br /> We anticipate the need for additional on-site weekly meetings in order to more fully <br /> coordinate with the contractor and plant staff. These meetings are at either the <br /> Contractor's place of business in Everett,or the WFP. Based on current meeting <br /> frequency, we anticipate a total of 56 additional meetings through the conclusion of the <br /> project. <br /> TASK 12 Documentation of Program Comparisons <br /> Includes additional effort beyond the basic scope of work to perform Line-by-Line <br /> comparison of the AB programs migrated from distributed control panels to the <br /> centralized AB Master PLC program and develop a technical memo indicating <br /> differences and other findings.These original AB PLC routines were developed outside <br /> of Contracted services.This included line-by-line comparison for PLC programming in <br /> the following Phase 1 areas: Hypochlorite, Flocculation, Chemical Feed, Backwash Pump <br /> Station,Water Quality, Fluoride, Portal 4,Soda Ash, Recovered Water, Finished water <br /> pump station 1, and TI Master MCP. Detailed efforts included: <br /> ■ Visually compare side-by-side verification that all routines and logic rungs are <br /> properly migrated from distributed PLCs and that they are fully represented <br /> within the master PLC logic. <br /> ■ Ensure that routines and system Tags avoid potential naming conflicts due to <br /> consolidation <br /> ■ Verify scaling,timer preset values,etc.are not affected by the consolidation <br /> ■ Compare before and after ladder logic rungs within applicable subroutines <br /> observing that"local"addresses are updated to corresponding remote <br /> addresses where used.Also,observe that aliases to local and remote addresses <br /> within the global tag list maintains rack,slot and channel positions. <br /> ■ Extract.CSV files for all tags within the old and new PLCs, obtain the DB2 Data <br /> Block file from Wonderware®and develop a comparison worksheet for each <br /> unit process area. Comparisons will use VLOOKUP within MS Excel to ensure <br /> that tags present within the original programs are also present within the <br /> September 28, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.