My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment 2 Tetra Tech Inc.
>
Contracts
>
6 Years Then Destroy
>
2018
>
Amendment 2 Tetra Tech Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2016 11:45:31 AM
Creation date
11/22/2016 11:45:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Tetra Tech Inc.
Approval Date
11/21/2016
Council Approval Date
11/2/2016
End Date
12/31/2018
Department
Public Works
Department Project Manager
Mike Robinson
Subject / Project Title
WFP PLC Replacement Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Total Compensation
$166,770.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett,WFP PLC 135-12589-12002 <br /> Additional Services <br /> migrated master program, will present corresponding Wonderware®tags, and <br /> will highlight ail tags between the PLCs that no longer match. <br /> TASK 13 PLC Program Documentation <br /> Additional reverse-engineering effort required to resolve missing or otherwise <br /> inaccurate legacy documentation(Tag and ladder rung descriptions)within the original <br /> TI 545 alternate backwash program. Efforts include: <br /> • Program reverse Engineering efforts to determine program functionality for the <br /> Alternate Backwash Program. <br /> • Develop coordinated timing diagrams for cascaded timers which do not have <br /> functional descriptions <br /> • Trace down individual contacts which have missing or otherwise inaccurate tag <br /> name descriptions(number of tags could be in excess of 100 ea). Develop new <br /> descriptions for contacts and rungs which are lacking this information. <br /> TASK 14 Additional Start-up and Commissioning Assistance <br /> Validation efforts beyond basic start-up and commissioning assistance estimated in the <br /> base Contract. Estimated efforts within base contract Proposals included minimal effort <br /> to assist the Contractor during their startup efforts. Detailed Commissioning and <br /> documentation were not anticipated.Additional efforts for this task include the <br /> following: <br /> • Provide services with on-site Tetra Tech personnel to implement field <br /> observation and detailed documentation for validation/sign-off related to I/O <br /> tag checkout. I/O Tags are verified functionally from the field instruments to the <br /> PLC and from the PLC to the SCADA HMI system. <br /> • Provide services with on-site Tetra Tech personnel to implement field <br /> observation and documentation for validation/sign-off related to functional <br /> system-level testing of automated processes,interlocks and equipment. <br /> Functionality to be verified for applicable modes of operation including local <br /> manual, remote manual and automatic. <br /> TASK 15 Troubleshoot and Resolve Network incompatibilities <br /> Troubleshoot and resolve existing N-Tron Switch issues which are causing a "data- <br /> storm" instability effect within the network. <br /> • Troubleshooting the network issues; it is assumed based on current evidence <br /> that incompatible firmware versions and outdated existing hardware are <br /> destabilizing the network any time the redundant network ring is fully closed. <br /> • Quality Controls Company(QCC)working under a separate Contract with <br /> Seahurst Electric will obtain updated firmware for N-tron Switches. <br /> • QCC working under a separate Contract with Seahurst Electric will implement <br /> corrective efforts to include flashing firmware on several switches. <br /> September 28, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.