My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8925 AIRPORT RD MUKILTEO SCHOOL DISTRICT 2018-01-02 MF Import
>
Address Records
>
AIRPORT RD
>
8925
>
MUKILTEO SCHOOL DISTRICT
>
8925 AIRPORT RD MUKILTEO SCHOOL DISTRICT 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 3:35:52 PM
Creation date
11/22/2016 5:26:42 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
8925
Tenant Name
MUKILTEO SCHOOL DISTRICT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE7ISED MITIGATED DETFRlIINATION OF NON-SIGNIFICANCE <br /> SEPA 50-92 <br /> Description <br /> of Proposal: The proposed action is the issuance of Public Works and <br /> Building Pexmits for the proposed eapansion of the Mukilteo <br /> School District's Central Facilities Complea. The proposed <br /> project includes the construction of a new central � <br /> warehouse (24,534 s.f.), a transportation maintenance <br /> facility (21,293 s.f.), a central kitchen facility (10,897 <br /> s.f.) and a graphics facility (6,251 s.f.). The project <br /> also includes the fil�±ng of .20 acres of wetlands and the <br /> creation of .43 acres of wetlands. <br /> Proponeat: Mukilteo School District No. 6 <br /> 9001 Airport Road <br /> �rerett, WA 98204 <br /> Contact: Hichael Saodgrass, 258-6471 <br /> Location: 9001 Airport Road <br /> Zoning: R-S <br /> Lead Agency: City of Everett Planning Department <br /> Contact Person: Faheem Siddiq, (206) 259-8731 <br /> Mitigation Measures: <br /> The environmental impacts of this proposal are documented in the Environme�tal <br /> Checiciist and other informatinn on file with the City. 11ie list..d <br /> requirements are placed ia reeponse to our review of this information: <br /> Agencies wi[h Jurisdiction: <br /> 1. A Aydraulics Project Approval (IfPA) fron the State Department of <br /> Fisheries rill be required for [his project due to its location in <br /> the Swamp Creek watershed. More stringent detention and water <br /> treatment requiremente thaa the City would impose may be placed on - <br /> the project as a condition of the HP1. A copy of the HPA from t'�e <br /> Department of Fisheries muat be included along with the plans :or <br /> Public Works review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.