Laserfiche WebLink
wedand cattail provides tiood and cover and fringing spirea and sa'monberry contribute to habitat <br /> values. <br /> The southeastern and northeastern upland fringes of this wedand have been selected as the locations <br /> for creabon of weUands as compensatory mitigation for construction impaccs to Wedands B and C. <br /> 3. FINAL MITIGATION PLAN <br /> 3.1 lntroduction <br /> This Final miagation plan updates acmal condidons, responds to condidons of approval and specifies <br /> requirements for excavation, drainage and vegetation(including list of replacement species), as well <br /> as construcdon management, performance standards, a monitoring and confingency program and <br /> recommended performance security. <br /> Inasmuch as such a final plan should be considered schematic in nature and accual field condiaons <br /> might require adjustment in planung in response to actual condidons, a qualified biologist should be <br /> consulted prior to implementing planflnS plans. Following construc6on, a site visit should be <br /> coordinated for review of post-construction conditions by Ciry of Everett staff to easure that goals <br /> and objectives and conditions of approval have been met. <br /> Project goals and objectives include demonstrable and qualitaflve replacement of functional ealue <br /> elements of the natural system on the Central Facility site, including crearion of approximately 0.289 <br /> acres of wedands in two azeas adjacent to Wedand E, southwest of the development azea, as <br /> compensatory miuga6on for unavoidable removal o e�P�ds B and C)�lOther goals inclade9 emoval <br /> of low value emergent and scrub-shrub weUands (W <br /> of the surface soils from a former corral o� the north side of�edan e�an guWe��ds�dun g a11 <br /> a temporazy erosion and sedimentadon control plan to p <br /> construction activities. <br /> Table 1 compazes functional values in the impact area with the values to be created in the proposed <br /> mitigation azea. <br /> Gey�e��nce�J wedands functPons�and values aseco pensatorymitigat on for w Uand losses dug ng <br /> construction. <br /> Construction plans specify a stepwise program for implementadon of the planned miUgaflon, <br /> including pre-conswcdon meeting, as well as staking of mitigation boundazies and implementaflon <br /> of temporazy erosion and sedimentation conlrol measures; excavaaon of miUgadon azea and <br /> stcekpiling of soil materials and contained rooutock and seedstcek; replacement of�soC �a�cu n <br /> planung, hydrologic regime establishanent and post-planGnB requirements; and p <br /> meeting. <br /> Page 6 <br /> Mukikeo Sch. Dist. Central Facility Final Mitigation Plan <br /> Lovell-Sauerland &Associates, lnc. <br />