My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8925 AIRPORT RD MUKILTEO SCHOOL DISTRICT 2018-01-02 MF Import
>
Address Records
>
AIRPORT RD
>
8925
>
MUKILTEO SCHOOL DISTRICT
>
8925 AIRPORT RD MUKILTEO SCHOOL DISTRICT 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 3:35:52 PM
Creation date
11/22/2016 5:26:42 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
8925
Tenant Name
MUKILTEO SCHOOL DISTRICT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1. Comparison of Functional Values, Exisring Wetlands m be Removed vs. Proposed <br /> Mitigation Area <br /> Areas to be Impacred Mitigadon Area <br /> Functio¢ Wetland B Wetland C Shaltow Emergent <br /> Hydrologic Support Minimai L.ow Moderate <br /> Streambase Flow Contribution Minimal Low Moderate <br /> Shoreline Stabilization N.A. N.A. N.A. � <br /> Water Quality Improvement Minimal Low Moderate <br /> S�ocm/Floodwater Management Minimal Low Moderate <br /> Groundwater Rechazge Minimal Low Low <br /> Wildlife IIabitatBiological Funcdons Minimal Low Moderate <br /> Overall Value Low Low Moderate <br /> Impact Area Size (acres) 0.016 0.079 0.289 <br /> Performance standards have been established ro ensure project success and provide a set of criteria <br /> for evaluating contractor and design effectiveness in meeting project goals. <br /> The monitoring Program will use performance standazds to assess project success over a five yeaz <br /> period following miugation construction and provide data to judge degree ro which individual <br /> componenu of the overall mifigadon plan meet the desired requirements. Coupled with the <br /> mouitoring program, potential contingency actions may be considered by the moaitoring biologist <br /> and Ciry oF Everett staff at key review points, for implementation in the event of identified mitigation <br /> shortfall. Based on an ini6al review of project cosu and approval by the Ciry, a performa�ece <br /> securiry bond will be recorded by the applicant, to ensure that all costs for monitoring and <br /> maintenance will be met during a five yeaz monitoring period and that conungency acfloas can be <br /> accomplished following completion of wetlands construction. <br /> 3.2 Goals and Objectives <br /> The principal project goal is creation of approximately 12,600 squaze feet of scrub-shrub and <br /> emergent wetlaad in two areas adjacent to a functional weUand (Wedand E) in the southwest wrner <br /> of the site. <br /> Other goals to be accomplished by the proposed mitigaaon plan include: <br /> • conversion of low-value and disturbed uplands to new wetlands adjacent to an established, <br /> funcfional wetland system, <br /> Mukilteo Sch. Dist. Certtral Facility Final Miagoaon Plan PagC 9 <br /> Lovell-Sauerland &Associates, lnc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.