Laserfiche WebLink
Washington State Department of Transportation Page 4 Six-year Transportation Improvement Program <br /> Agency Everett From 2008 to 2013 <br /> County No. 31 Hearing Date: <br /> City No. 420 Adoption Date: <br /> MPO PSRC _ Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title RAN <br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2008) (2009) (2010) 6th Type (MM/YY) <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 16 3 HP-1998(015); 3 phases in project;supercedes Lowell 1 S,P 0.25 S PE 7/1/2011 1,000 1,000 1000 <br /> Minor Neighborhood Bypass P RW 7/1/2012 800 800 800 <br /> Arterial Lenora St./BNSF Rail Line Overcrossing CN 5/1/2014 6000 6000 <br /> Lenora St.and BNSF Rail Line FMSIB 4300 4300 <br /> NA <br /> Design and construct rail line overcrossinq Totals 4,300 7,800 12,100 0 0 0 1,800 <br /> 16 4 3 phases in project 4 P 0.9 C PE 1/1/2009 AIP 360 120 480 480 <br /> Minor Joint project with Sno.County-(County Lead) P RW 7/1/2010 AIP 387 129 516 516 <br /> Arterial 116th Street SE Improvements T CN 5/1/2011 AIP 2,060 744 2,804 2,804 <br /> 116th Street SE W <br /> SR 527 to 35th Avenue SE G <br /> Design,construct 3 lane street with bike&ped improv. _ Totals 2,807 993 3,800 0 480 516 2,804 <br /> 16 5 2 phases in project 4 P - 1 C PE 2/1/2009 AIP 252 84 336 336 <br /> Minor P CN 6/1/2010 AIP 1,660 604 2264 2,264 <br /> Arterial 100th Street SW Improvements T 0 <br /> 100th Street SW 0 <br /> Airport Road to Evergreen Way _ <br /> Design,construct road widening&other improvements Totals 1,912 638 2,600 0 336 2,264 0 <br /> 16 6 3 phases in project 6,12 P 0.6 C PE 3/1/2011 75 75 75 <br /> Minor P RW 3/1/2012 50 50 50 <br /> Arterial Casino Rd. Safety Improvements T CN 5/12013 375 375 375 <br /> Casino Rd.and intersections W <br /> Evergreen Way to 5th Avenue W. G __ _ <br /> Design,construct safety improvements Totals 500 500 0 0 0 500 <br /> 16 7 3 phases in project 4 P 0.5 C PE 1/1/2010 AIP 750 750 1500 1,500 <br /> Minor Sno.Co.is lead agency P RW 1/1/2011 AIP 1,000 1,000 2000 2,000 <br /> Arterial 4th Avenue West Improvements T CN 5/1/2012 AIP 2,750 2,750 5,500 5,500 <br /> 4th Avenue West W <br /> 112th Street SW to 104th St.SW G <br /> Design,construct street improvements Totals 4,500 4,500 9,000 0 0 1,500 7,500 <br /> 16 8 2 phases in project 8 P 2 C PE 2/1/2009 300 300 300 <br /> Minor P CN 5/1/2010 2,700 2700 2,700 <br /> Arterial Colby Avenue Streetscape Improvements T 0 <br /> Colby Avenue W <br /> 19th Street to 41st Street S <br /> Design,construct streetscape improvements G Totals _ 3,000 3,000 0 300 2,700 0 <br /> 16 9 3 phases in project 4 P 1 C PE 1/1/2009 RTID 2000 2000 2,000 <br /> Minor P RW 1/1/2010 RTID 3,000 3000 3,000 <br /> Arterial 100th Street SE Improvements T CN 5/1/2011 RTID 15000 15,000 15000 <br /> 100th Street SE W <br /> SR 527 to 7th Avenue SE G <br /> Design,construct street Improvements Totals 20,000 0 20,000 0 0 2,000 18,000 <br /> 16 10 3 phases in project 6 P 1 C PE 1/1/2013 AIP 1000 1000 2000 1000 <br /> Minor P RW 1/1/2015 AIP 1,500 1,500 3000 <br /> Arterial 100th Street Improvements T CN 5/12018 15000 15,000 <br /> 100th Street SE (actual alignment to be determined) W <br /> 7th Avenue SE to Evergreen Way G <br /> Design,construct street improvements Totals 2,500 17,500 20,000 0 0 0 1,000 <br /> 16 11 3 phases in project 6 P 1 C PE 1/1/2011 AIP 500 500 1000 2000 <br /> Minor P RW 1/1/2013 AIP 500 500 1,000 <br /> Arterial 110th Street S.E.Improvements T CN 5/1/2015 AIP 2500 2500 5000 <br /> 110th Street S.E. W <br /> SR 527 to 35th Street S.E. G <br /> Design,construct street improvements Totals 3,500 3,500 7,000 0 0 0 2,000 <br />